Ryan Belardi, 8, rides a zipline Wednesday at the Dream Playground at Erickson Playfield as siblings James Belardi, 6, and Hayleigh Belardi, 2, along with their mother, Rachel Belardi, all of Port Angeles, wait at the launch platform. (Keith Thorpe/Peninsula Daily News)

Ryan Belardi, 8, rides a zipline Wednesday at the Dream Playground at Erickson Playfield as siblings James Belardi, 6, and Hayleigh Belardi, 2, along with their mother, Rachel Belardi, all of Port Angeles, wait at the launch platform. (Keith Thorpe/Peninsula Daily News)

Weekend sale to raise money for security lighting

Foundation board members donating funds

PORT ANGELES — Once you’ve built it, you have to protect it.

Members of the nonprofit Dream Playground Foundation, who organized construction of the updated Dream Playground at Erickson Playfield, have a goal of installing at the site security and safety lighting, which will be funded primarily through a donation from one of its members.

Board member Al Oman and his wife, Nancy, plan to hold an estate and garage sale this weekend of items that formally belonged to Oman relatives, as well as a collection of other things contributed by friends and other board members.

Proceeds from the event will go toward the lighting effort.

The sale is scheduled to run from 8 a.m. to 3 p.m. on Saturday and Sunday at 214 Hancock Ave. in Port Angeles. Included will be furniture, tools, dishware, silver, appliances and numerous other items.

Steve Methner, president of the foundation, said he was grateful for the Omans’ efforts to improve the playground.

“It’s a really touching thing,” he said. “Al and Nancy weren’t quite sure what to do with all his parents’ things.”

Al Oman, who helped construct the new playground, said he had been storing family items in an outbuilding for years and that it was finally time to begin dispersing some of it.

“It’s just an accumulation,” he said. “It just all ended up with me.”

Methner said the lights would be primarily for security of the playground and not for nighttime play. He added that plans are still in the early stages and that he had no estimate of cost or scope of the project.

“I really have no idea yet. It’s a new idea that we’ve decided to do very recently, and we really don’t know what it’s going to take to do this,” he said.

Oman, who also does electrical work for the City of Port Angeles, said there are specific standards that have to be met when it comes to outdoor lighting. Energy efficiency and the mitigation of light pollution are among them.

“You can’t just throw any old light up,” he said.

The second version of the Dream Playground was built on the site of a former version of the playground, which was razed earlier this year amid concerns about safety and maintenance.

Like its predecessor, the new playground was designed primarily by area children, paid for through a fundraising campaign and built by volunteers over several weeks in June and July.

It was opened to the public on Aug. 20 and formally dedicated on Sept. 11.

Methner said the Omans’ efforts are a welcome contribution, keeping in the community spirit of the Dream Playground.

“This is such a neat thing to do,” he said.

________

Photojournalist Keith Thorpe can be reached at 360-452-2345, ext. 59050, or at kthorpe@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading