Waste water flows into Ludlow Bay

PORT LUDLOW — An estimated 10,000 to 20,000 gallons of waste water bubbled up from manholes, ran through bioswales and emptied into Ludlow Bay on Wednesday morning.

Olympic Water & Sewer company said that a failed pump in its electrical system caused the waste water to flow into the bay at about 7:45 a.m.

It was fixed in 15 minutes, the company said in a written statement, with the pump repaired and the overflow stopped by 8 a.m.

The company president said he doesn’t expect long-term damage or impact from the spill.

“We worked through the day and took water quality samples, which are being analyzed now,” said Larry Smith, president of Olympic Water & Sewer Inc.

“We don’t expect to find any fecal coliform in the water, but it’s a precaution we are taking.”

Over the next few days, treatment-plant flow records will be analyzed to determine a more accurate estimate of the volume of the incident, the company statement said.

The failed pump caused an internal electrical system failure, the company said. That failure prevented a second pump from starting, which caused the backup and overflow.

Failure said to be unusual

The alarm system did not recognize the failure because it was unusual, the statement said, and company officials are investigating possible electrical modifications to the alarm system to prevent a recurrence.

“It was an unusual mechanical situation and it was contained quickly after it was discovered,” Smith said.

In addition, Olympic Water & Sewer has retained outside consultants to direct water quality tests in Ludlow Bay.

Test results will not be known for several days, but the consultants’ preliminary assessment is that little damage was caused, and there will be no long-term affects, according to the statement.

Investigators with the state Department of Ecology, which regulates waste water systems and the state Department of Health and Shellfish Program, also are looking into the spill.

Port Ludlow residents with questions about the incident can phone Smith at 360-437-8246.

________

Reporter Erik Hidle can be reached at 360-385-2335 or at erik.hidle@peninsuladailynews.com.

More in News

Two dead after tree falls in Olympic National Forest

Two women died after a tree fell in Olympic National… Continue reading

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading