Pat McElroy, an engineer for Clallam County, said construction crews plan to place about 8 inches of gravel and 6 inches of hot asphalt to repave the Ward Bridge over the Dungeness River. (Matthew Nash/Olympic Peninsula News Group)

Pat McElroy, an engineer for Clallam County, said construction crews plan to place about 8 inches of gravel and 6 inches of hot asphalt to repave the Ward Bridge over the Dungeness River. (Matthew Nash/Olympic Peninsula News Group)

Ward Bridge renovation nears completion

Construction repairs piers, prevents sinking

SEQUIM — Ward Bridge along Woodcock Road and over the Dungeness River tentatively will reopen in early October.

Clallam County officials closed the bridge in late June to repair the bridge’s piers and resurface its roadway.

Clallam County engineer Pat McElroy said contractor Bruch & Bruch Construction Inc. of Port Angeles anticipates paving the roadway this week and finishing construction the first week of October, barring bad weather.

The approximate $1.2 million project is on budget, McElroy said.

He said the bridge’s piers were built in the late 1930s and its superstructure was rebuilt in the late 1970s.

“It was starting to drop due to the river cutting into the piers,” McElroy said.

To prevent future damage, crews spent about a month digging 11 feet next to each pier and placing riprap.

McElroy said crews detoured the Dungeness River for each pier and used three 8-inch hoses to keep the holes dry.

Each pier was repaired with epoxy, too.

“They are better than when they were new,” he said.

The pedestrian walkways will remain largely the same. Some repairs were made to one section that was damaged by a tree.

Accessing the walkways along the sides of the bridge should be easier without a concrete barrier blocking them. McElroy said.

Crews also expanded parking on the west side of the bridge for about six vehicles and added permanent construction access below the bridge.

To finish the project, McElroy said crews will add about 8 inches of gravel and 6 inches of hot asphalt to the roadway, revegetate the hill sides by the bridge and place a new guard rail.

For more information on the project, visit www.clallam.net/roads/WardBridgeScour Repair.html.

________

Matthew Nash is a reporter with the Olympic Peninsula News Group, which is composed of Sound Publishing newspapers Peninsula Daily News, Sequim Gazette and Forks Forum. Reach him at mnash@sequimgazette.com.

The pedestrian/bicycle pathways along Ward Bridge will be easier to access once work is complete, said Pat McElroy, an engineer for Clallam County. (Matthew Nash/Olympic Peninsula News Group)

The pedestrian/bicycle pathways along Ward Bridge will be easier to access once work is complete, said Pat McElroy, an engineer for Clallam County. (Matthew Nash/Olympic Peninsula News Group)

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading