The Polar Pioneer oil rig is towed by tugs in Port Angeles Harbor on Sunday morning after being offloaded from the MV Blue Marlin. (Arwyn Rice/Peninsula Daily News)

The Polar Pioneer oil rig is towed by tugs in Port Angeles Harbor on Sunday morning after being offloaded from the MV Blue Marlin. (Arwyn Rice/Peninsula Daily News)

UPDATE: Oil rig Polar Pioneer, heavy lift ship Blue Marlin now separate in Port Angeles Harbor [PHOTO GALLERY]

PORT ANGELES — Two giant vessels that arrived in Port Angeles Harbor as one massive unit are now operating separately.

The Polar Pioneer oil drilling rig was offloaded Sunday at about 7 a.m. from the heavy lift ship MV Blue Marlin, which carried the huge mobile rig from Malaysia starting in early March.

There were no special safety concerns regarding the operation, and regular Coast Guard patrols continued Sunday, said Chief Petty Officer David Mosley, spokesman for the Coast Guard in Seattle.

“We all knew it was occurring,” Mosley said.

A 100-yard safety zone remains in place around both the Polar Pioneer and Blue Marlin, which are classified as being a single unit under the safety zone protection as long as they are moored near each other, he said.

The safety zone expands to 500 yards if either vessel is underway.

The Blue Marlin will no longer have the safety zone enforced once one of the two vessels departs the harbor, though the zone will stay in place for the oil rig, Mosley said.

The 400-foot-long, 355-foot-tall rig owned by Transocean Ltd. is one of two vessels Royal Dutch Shell plans to use for exploratory drilling in the Chukchi Sea off Alaska’s northern shore.

The second rig, the drill ship Noble Discoverer, will pass through the Strait of Juan de Fuca on its way to Seattle sometime in May and will not stop in Port Angeles.

A group of Foss tugboats led by the 360-foot icebreaker tug Aiviq helped to separate the Blue Marlin and the Polar Pioneer Sunday morning and towed the rig a short distance to an anchorage site west of the Blue Marlin.

The Blue Marlin is a partially submersible heavy lift ship, which loads and unloads its cargo by submerging its large open deck below the water’s surface, allowing its cargo to float on or off.

At least seven tugs assisted in the operation, from the 8,000 horsepower 155-foot enhanced tractor tugs Lindsey Foss and Garth Foss, to the 3,300 horsepower, 95-foot tug Daniel Foss.

The tug fleet offered a combined 28,000 horsepower to the offloading process, according to vessel profiles from the Foss website at www.Foss.com.

Several of the tugs remained with the Polar Pioneer in the harbor to assist with control of the massive floating platform.

Efforts to reach Shell representatives Sunday were unsuccessful.

The rig will remain in the harbor for about one more week while it is prepared to be towed to Seattle for prepared for arctic drilling.

Information about how long the Blue Marlin will remain in the harbor here or where it will sail to next was not available Sunday.

The ship and rig arrived in Port Angeles Harbor on April 17, greeted by a stream of curious onlookers and a contingent of protesters who departed after a few hours.

The ship was intercepted by the Greenpeace vessel Esperanza — a recycled Russian firefighting ship with a crew of 35 — while traversing the Pacific Ocean.

On April 6, six Greenpeace activists boarded the Polar Pioneer about 750 miles northwest of Hawaii and remained on board for about six days, often holding protest signs saying “The People vs. Shell.”

Protesters oppose Arctic offshore drilling and have maintained that oil companies have not demonstrated they can clean up a major spill in the remote arctic region.

Rough seas forced the activists off the rig and back to the Esperanza, and U.S. District Judge Sharon Gleason in Anchorage, Alaska, issued a temporary restraining order that blocked the group from repeating the protest.

The ruling bars Greenpeace and its activists from boarding, barricading or interfering with the movement of the Polar Pioneer, the Blue Marlin or the Noble Discoverer.

The ruling remains in effect until at least Tuesday, when a hearing on the matter is scheduled.

The Esperanza followed the Blue Marlin to the Strait of Juan de Fuca but did not enter Port Angeles Harbor and instead docked in Victoria, B.C.

________

Reporter Arwyn Rice can be reached at 360-452-2345, ext. 5070, or at arice@peninsuladailynews.com.

Sequim-Dungeness Valley Editor Chris McDaniel contributed to this report.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading