The Elwha River flows under a new temproary bridge that was installed last week. The bridge is not open to public vehicle access and Olympic Hot Springs Road is still closed to vehicle traffic. (Jesse Major/Peninsula Daily News)

The Elwha River flows under a new temproary bridge that was installed last week. The bridge is not open to public vehicle access and Olympic Hot Springs Road is still closed to vehicle traffic. (Jesse Major/Peninsula Daily News)

Temporary bridges improve foot, bike access to Elwha Valley

OLYMPIC NATIONAL PARK — Olympic National Park has installed two new temporary bridges on Olympic Hot Springs Road across the Elwha River, but visitors will still need to walk or bike in if they want to see the Elwha Valley.

The park finished installing the two bridges Friday, allowing park staff to work on projects beyond the former Elwha Campground where the road washed out last winter, said ONP spokesperson Penny Wagner.

“Right now public access is going to be by foot or by bicycle even while we have those temporary bridges,” she said.

“There’s going to be a lot of equipment going in and out.”

She said she was unable to confirm Monday with the Federal Highway Administration as to why the bridges cannot be opened to the public.

Those bridges will allow park staff to work on roofing, painting and structural issues in the buildings near the ranger station, just south of the washout, before more damage is done to the road during future storms.

“They aren’t going to have maintenance for the next few years,” she said.

She said crews are also going to spend the summer working on Olympic Hot Springs Road and Whiskey Bend Road in anticipation for winter storms.

Once the weather starts to worsen in late summer or early fall, the park will remove the two new bridges and the older bridge the was put in temporarily after a nearby section of river washed out in 2015.

That bridge is on loan from the Federal Highway Administration and needs to be removed before the river takes it, she said. It will stay in the park for now, she said.

“It’s dynamic right now with the river and it remains to be seen what will happen this fall,” she said, adding that a log jam is holding back water upstream from the bridges. “If storms hit again and … that log jam breaks up, we want to make sure that bridge doesn’t get lost.”

Once the bridges are out, anyone looking to access the Elwha Valley will need to use the bypass trail that takes visitors around the washout area.

She said the temporary bridges will allow crews to move forward on geotechincal testing on Olympic Hot Springs Road, part of the park’s effort to assess the possible relocation of the road.

The park has been fighting to maintain visitor access to the Elwha River since the National Park Service led the $325 million effort to restore the Elwha River to its natural state with the removal of the Elwha and Glines Canyon dams.

The river has been free from the two dams since 2014, which has allowed the river to move through its floodplain.

The park is also preparing an Environmental Assessment as it looks at testing a possible new route for Olympic Hot Springs Road.

The study would include 28 borings along existing roadway and off-road along a one-mile stretch of the slope east of Olympic Hot Springs Road to investigate the stability of the slope

The EA is needed before geotechincal testing can move forward on that route. The EA isn’t required to drill into the existing road.

She said the EA recently finished internal review and was forwarded to the regional office for review. The park hopes to have the EA available to the public this September, she said.

Once the study is finished, the park would continue preparing a second environmental assessment that would address relocating the road, modifying the road on the current alignment or doing nothing.

In all, the park has spent more than $450,000 on its temporary efforts to maintain visitor access in Elwha River Valley.

________

Reporter Jesse Major can be reached at 360-452-2345, ext. 56250, or at jmajor@peninsuladailynews.com.

Olympic National Park visitors walk on Olympic Hot Springs Road, which is closed to vehicle traffic, as they head back to the parking lot at the park entrance. (Jesse Major/Peninsula Daily News)

Olympic National Park visitors walk on Olympic Hot Springs Road, which is closed to vehicle traffic, as they head back to the parking lot at the park entrance. (Jesse Major/Peninsula Daily News)

Olympic National Park workers cross the new temporary bridge that spans the Elwha River on Olympic Hot Springs Road. (Jesse Major/Peninsula Daily News)

Olympic National Park workers cross the new temporary bridge that spans the Elwha River on Olympic Hot Springs Road. (Jesse Major/Peninsula Daily News)

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading