Steve Burke, William Shore Memorial Pool District executive director, talks about the features of the Shore Aquatic Center on Thursday, Aug. 27, 2020, in Port Angeles. (Keith Thorpe/Peninsula Daily News)

Steve Burke, William Shore Memorial Pool District executive director, talks about the features of the Shore Aquatic Center on Thursday, Aug. 27, 2020, in Port Angeles. (Keith Thorpe/Peninsula Daily News)

Shore Aquatic Center plans October opening

COVID-19 precautions to be in place

PORT ANGELES — Steve Burke did not expect a global health crisis to cannonball the grand opening of the Shore Aquatic Center.

COVID-19 caused a splash but could not sink the $20 million renovation of the former William Shore Memorial Pool in Port Angeles.

The 30,000-square-foot facility, which doubled in size, is scheduled to open in early October at a limited capacity for coronavirus precautions.

“I would highly recommend not doing a construction project during a pandemic,” said Burke, the pool’s executive director, in a recent interview.

“That’s a unique one.”

Despite a four-month delay — the opening was originally planned for June — the pool at 225 E. Fifth St. is expected to be completed on budget.

“I don’t want to jinx myself, but we are within budget numbers,” Burke said.

A community open house is scheduled for Oct. 2. Public tours will be available.

Limited-capacity swimming will begin Oct. 3. Reservations will be required.

“When we have people come in, it will be for a two-hour session,” Burke said.

“And then we’ll have a half-hour down to clean. Then we’ll have another two-hour session available.”

A formal opening ceremony will be held after COVID-19 restrictions are lifted, Burke said.

The pool will be open daily between 5:30 a.m. and 9 p.m. General admission prices are $6 for adults, $3.50 for youth, seniors and veterans, and $12 for a family. Annual members are $350 for adults, $205 for youth, seniors and veterans, and $485 for a family.

Burke said the prices were raised by about 3 percent from 2019.

Capacity will be limited to 91 swimmers to comply with COVID-19 restrictions. The aquatic center was designed to hold more than 300.

“It’s frustrating that we have to limit capacity, but it’s the right thing to do,” Burke said.

The state Department of Health requires that each swimmer have 72 square feet of space in the water, Burke said.

William Shore Memorial Pool District executive director Steve Burke walks past one of four pools during a tour of the Shore Aquatic Center in Port Angeles on Thursday, Aug. 27, 2020. (Keith Thorpe/Peninsula Daily News)

William Shore Memorial Pool District executive director Steve Burke walks past one of four pools during a tour of the Shore Aquatic Center in Port Angeles on Thursday, Aug. 27, 2020. (Keith Thorpe/Peninsula Daily News)

Dr. Allison Unthank, Clallam County health officer, said it is safe to swim at public pools as long as the facility follows COVID-19 safety guidance.

“There are no documented cases of COVID-19 from shared bodies of water,” Unthank said Thursday.

“The primary risk for transmission in pools is close contact between patrons getting in and out of the water,” she added.

“As long as the facility follows the guidance, properly disinfects and prevents crowding, the space should be quite safe.”

The Shore Aquatic Center contains four bodies of water: a six-lane lap pool with a dive tank, a wellness pool for exercise classes, an activity pool with splash-and-play features and a spa.

“Our most limiting factor at the pool is our lap lanes,” Burke said.

“You’re only allowed one person per lap lane.”

The lap pool will kept at about 79 degrees, down from 83 degrees in the former pool.

An activity pool is one of four pools being completed at the Shore Aquatic Center. (Keith Thorpe/Peninsula Daily News)

An activity pool is one of four pools being completed at the Shore Aquatic Center. (Keith Thorpe/Peninsula Daily News)

The wellness pool and activity pool, which includes a lazy river and vortex ring, will be kept at a comfortable 88 degrees. Swimmers also can relax in a 104-degree spa.

All told, the four pools contain 330,000 gallons of water, up from 200,000 gallons in the former pool.

The pool’s heating, pumping, filtration and salt-generation chlorine systems are operated from a control panel inside a mechanical room.

Chlorine is made on site from the pool’s saltwater, resulting in a neutral PH and less eye and skin irritations than traditional pools.

“Essentially, we’re our own little chlorine manufacturer,” Burke said during a Thursday tour of the facility.

The water is filtered through ultraviolet light, which is “really good because that inactivates COVID-19,” Burke said.

Once school sports return, Shore Aquatic Center will be home to the Port Angeles High School boys and girls swim and dive teams, which competed at the Sequim YMCA during the 2019-20 seasons.

The pool is a supported by a junior taxing district that shares the boundary of the Port Angeles School District.

In 2017, voters agreed to raise the district’s debt capacity from $6.5 million to $10 million. The renovation was funded with bonds, state and federal grants and cash reserves.

“It’s going to be an amazing asset to our community,” said Burke, who is also a Port of Port Angeles commissioner.

Shore Aquatic Center was named for William “Bill” Shore, who taught thousands of Port Angeles children how to swim in the 1950s. Shore will be memorialized on a wall above the spacious main entrance. A “Hall of Records” will display top meet times and more history about the pool.

Neeley Construction of Puyallup and its local subcontractors demolished most of the 1961 pool building last summer.

Construction on the new facility was halted for about two weeks at the beginning of the COVID-19 pandemic and resumed with extra safety precautions in April.

A children’s playground will be a feature of the Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

A children’s playground will be a feature of the Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

The new aquatic center has a dedicated indoor space for the Splash, Play and Active Recreation for Kids (SPARK) Squad after-school program and an outdoor playground with multiple features above a synthetic turf.

The main entrance was moved from the east side to the west side of the property, where a new parking lot was built.

The pool has spacious locker rooms, offices and a meeting space that can be rented for birthday parties and other events.

Large windows on the south side of the energy-efficient building show views of Klahhane Ridge and Mount Angeles.

At full capacity, the pool will have about 75 part-time and full-time employees, Burke said. A team of 30 to 35 will staff the pool at its limited-capacity reopening.

“We have plenty of room to do social distancing within here,” Burke said.

“Plus, being in the water is a very safe activity.”

For information, see sacpa.org.

_________

Reporter Rob Ollikainen can be reached at rollikainen@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading