Shine: Hood Canal Bridge cable breaks; engineers assessing extent of misalignment for drawspan, but road traffic unaffected

SHINE — One of the dozens of braided steel cables holding the Hood Canal Bridge in place has broken from a concrete anchor.

Although the anchor helps to keep the bridge in alignment when the draw span is opened to let boats, ships and submarines pass, the broken cable is not expected to affect highway traffic.

State Department of Transportation workers discovered the cable hanging slack Wednesday during a regular inspection of the aging floating bridge that serves as the North Olympic Peninsula’s lifeline to the Puget Sound region.

Divers inspected the cable late Wednesday afternoon, but the specific location of the break and the reason it broke wasn’t immediately known.

Department of Transportation spokesman Lloyd Brown said the cable and anchor are located on the Kitsap County side of the bridge and are at the very northeast part of the drawspan that opens to allow vessel traffic to access Hood Canal.

That 43-year-old half of the 1.5-mile bridge is scheduled to be replaced in 2007 by new anchors, pontoons and road deck constructed in Port Angeles and towed to Hood Canal.

Attached by 3-inch cables

The anchors holding the bridge in place weigh 685 tons to 1,875 tons each and are attached to the bridge by 3-inch cables.

Depth of the water under the floating bridge is 80 feet to 340 feet.

The bridge carries up to 18,000 vehicles daily.

Divers were investigating the slack cable on Wednesday afternoon.

“We’re not sure how deep it is or where the break happened,” Brown said.

What Transportation officials are sure of is that pleasure boat traffic requiring the bridge to open for passage will have to wait.

Normally, maritime traffic has right of way at the bridge, requiring it to draw open, according to Brown.

But now the bridge will not be opened for marine traffic during some tidal movements and storms, he said.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading