Sequim mandates infrastructure before development

SEQUIM — In another long-discussed move toward managed growth, the Sequim City Council voted 6-1 Monday night to adopt its first concurrency ordinance.

Simply put, concurrency means “you can’t build it, at all, period, if we don’t have sufficient infrastructure to serve it,” City Attorney Craig Ritchie explained during the council’s meeting Monday.

“It” is a development, such as a subdivision or a shopping center like the many that sprang up over the past decade here.

Infrastructure, that oft-used urban planning word, includes things like water pipes, sewer and storm water drainage systems and decent roads.

For decades, Ritchie said, Sequim permitted projects and assumed there was practically unlimited water and sewage capacity.

And “in the good old days there was always enough water, because we just drew more out of the river or out of a well,” the attorney noted in his report.

“There was always more sewage capacity because we just dumped it into the Strait [of Juan de Fuca],” he added.

“Transportation infrastructure seemed not to be a problem, until cities started noticing rush hours and congestion.”

Today, however, the state Growth Management Act requires concurrency, at least with streets and traffic control.

Sequim’s new ordinance takes that several steps further, covering water, wastewater, reuse water, storm water drainage and parks and recreation as well as the transportation system.

So before the city approves a new development, it must ensure that all of those infrastructure elements will be in place and upgraded to serve the population, Ritchie said.

Council member Bill Huizinga was the lone dissenter in Monday’s vote, saying that before adopting the ordinance, Sequim should establish standards of service, especially for parks and open space.

“We’re way ahead of ourselves,” Huizinga said.

“We need to have a long and serious discussion,” about how much parkland the city should provide for its residents.

City Manager Steve Burkett responded that Sequim has plentiful open space now, but has yet to adopt a master plan for its parks.

“The council could defer action,” Burkett said, until after that plan — and others for stormwater and related utilities — are finalized.

But member Ted Miller called for adoption of the ordinance now.

“If we wait, it could take years,” before the council approves all those plans, he said.

With a concurrency ordinance in place already, Miller added, the city can start defining standards for open space and other infrastructure.

And when those are established, the ordinance makes them instantly enforceable, he said.

________

Sequim-Dungeness Valley Reporter Diane Urbani de la Paz can be reached at 360-681-2391 or at diane.urbani@peninsuladaily news.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading