Sequim downtown lot to be prepped for redesign with three potential concepts

City purchased Centennial Place property in 2013 for 100th anniversary

SEQUIM — Concepts to redesign Centennial Place, one of Sequim’s most visible intersections at the northeast corner of Sequim Avenue and Washington Street, could see the Sequim City Council’s approval in late October.

Consultants with JETT Landscape Architecture and Design developed three concepts following input from a 2021 community survey and video from the Sequim Understory project, along with interviews with business owners, local stakeholders and members of the Sequim Arts Commission and the city’s Parks, Arbor and Recreation Board.

Todd Bronk, Landscape architect and sustainable building advisor with JETT, said at the Sept. 11 city council meeting the company won’t whittle the designs down to one but rather three designs — “Farmyard,” “Flow” and “Woven” — and prepare them for the city to decide later on.

JETT consultants plan to revise and present more finalized versions of the concepts tentatively with the Parks, Arbor and Recreation Board on Oct. 16, the Sequim Arts Commission on Oct. 23, and Sequim City Council on Oct. 30.

According to city documents, Sequim council members budgeted $50,000 for the designs, and the city’s 2024-2029 Capital Improvement Program has $100,000 scheduled for continuing progress. Both are funded from the city’s General Fund.

Hannah Merrill, Sequim’s parks and facilities manager, said staff can use the designs and cost estimates to pursue grant funding, but “it’s uncertain how long it’d take to secure funding for construction and maintenance.”

The City of Sequim purchased the property, formerly known as the Gull lot, in 2013 for the city’s centennial year.

It’s been readily used since the purchase but relatively unchanged aside from new benches, plants and trash bins installed.

Concepts

JETT’s first concept, “Farmyard,” offers a rain garden along the west side of the lot, a lawn in the middle, a porch and swings along East Washington Street, a seat-wall along the lawn, an interactive storm(water) feature, and covered enclosures north of the property for sitting and eating.

The “Flow” concept proposes a multi-use pavilion, a stage, lawn, sun dial, “Welcome to Sequim” in 3-D letters, a promenade and plantings.

For the “Woven” concept, it envisions a large sculptural structure, such as the mountainscapes, a stage, a boardwalk at the northern part of the property and small gathering spots.

Consultants said in an online video to council that Farmyard is the “most expected and regular of the concepts,” while “Flow” connects the Sequim Civic Center’s Plaza to Washington Street in design and feel.

With “Woven,” they said the sculptural structure would need to have an artistic presence at day and night.

All of the concepts provide a space for more dining and seating, and a spot for the downtown Christmas tree to go following feedback.

The “Woven” concept proposes putting the tree in the middle of a large sundial.

Input

Consultants met with business owners, stakeholders and city commissions from April through August about the lot redesign.

Some of their points emphasized the need for the park to function well during festival days while being welcoming and comfortable on non-festival days, making the lot an “Iconic Front Porch to Sequim,” adding enhanced/curated art,balancing hardscapes and softscapes, adding noise buffering; plantings should be native species, and they asked for consideration of crime prevention and weather-proofing any structures.

Consultants said there were discussions about the importance of the history of the lot and Sequim, so they will seek ways to incorporate that into designs.

At the Sept. 11 council meeting, council member Vicki Lowe echoed that sentiment, saying she wanted something to connect Sequim’s history to the lot.

Overall, city council members split on their favorite concepts and elements, such as adding green space and keeping a space for a Christmas tree.

Council member Rachel Anderson said the greenspace would be an improvement, but she felt the structure proposed in “Woven” “serves no purpose” and “would get in the way.”

She was also hesitant about adding any decking for fear of children getting hurt.

________

Matthew Nash is a reporter with the Olympic Peninsula News Group, which is composed of Sound Publishing newspapers Peninsula Daily News, Sequim Gazette and Forks Forum. Reach him at mnash@sequimgazette.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading