Sequim considers new water rates; public hearing set Oct. 13

SEQUIM –– Consumption will factor more into the bills of city water users if a new rate structure is approved by the Sequim City Council.

Public Works Director Paul Haines presented the council last week with a revamped structure for water rates that would lower the base consumption rate from 800 cubic feet of water per month to 600 cubic feet.

Additional consumption charges would be applied to those who use between 600 to 1,600 cubic feet.

Those who use more than 1,600 cubic feet would pay an additional 25 percent per cubic foot.

“Our thought in lowering that is to make rates more conservation sensitive and to give our customers more control over how much they want their bill to be,” Haines said.

A public hearing on the proposed rate structure, followed by consideration of approval, is scheduled for the next city council meeting at 6 p.m. Oct. 13 at the Sequim Transit Center, 190 W. Cedar St.

The council had raised water and sewer rates by 4 percent for all users in the 2014 budget.

The base rate for water service for a single-family home rose from $22.22 per month to $23.11 per month.

The base rate for sewer service rose from $58.42 per month to $60.76 per month.

City officials studied water rates over the past year with the goal of making rates more equitable and to encourage water conservation.

The city currently has 69 customers who use more than 1,600 gallons per month, Haines said.

Another 190 customers would be paying higher rates under the plan because they use more than 600 gallons per month and less than 800 gallons.

“Hopefully, they can reduce their use and realize those savings,” Haines said.

The plan calls for changes to the rate structure to be phased in over the next four years.

A study by Peninsula Financial Consulting last year said the city needed 4 percent annual revenue increases in each of the water and sewer funds through 2019 to fund capital improvements that will be needed in the next several years.

The new rate structure does add funding to both accounts, leaving an annual rate increase of 2.69 percent for water users over the next four years and 1.42 percent to sewer bills.

But those averages, Haines said, do not apply to every class of users.

Some would see higher increases while others might see their bills drop.

“A gallon of water is a gallon of water. What we’re trying to do here is make that charge unified across classifications,” Haines said.

Under the current rate structure, Sequim’s residential water users — in single homes or multi-family homes — account for 60 percent of the city’s total billings, though they use 54.2 percent of the city’s water.

Commercial users, irrigators and public facilities pay less for the water they use, accounting for 36.8 percent of billings and 40.2 percent of use.

Adult-care facilities carry an especially light load of the city’s water costs, Haines added, using 5.6 percent of the city’s water and paying 3.2 percent of the city’s bills.

The disparity is even greater in sewer billings, as residential users account for 74.5 percent of the city’s billings, though their estimated actual sewer use is 60.1 percent of the whole system.

Commercial, public and hotel/motel users account for just 22.2 percent of billings, though use is estimated at 31.5 percent of the system.

Adult-care facilities account for an estimated 8.4 percent of the sewer system’s use but just 3.4 percent of billings.

The new structure would reclassify adult-care facilities as multi-family developments like apartment complexes, which would lead to higher rates.

Those increases would be slowly phased in by 2018, Haines said.

Multi-family buildings would be charged 95 percent of single-family residential rates and hotels and motels would pay 75 percent of that.

“Why should they pay less?” Councilman Erik Erichsen asked during last Monday’s council meeting.

“You’re penalizing the people who own a home because they own a home.”

Haines, though, said multi-family buildings and hotels cost less to service because they have one hookup to maintain.

In a contrasting move, the Port Angeles City Council is considering a proposal to do away with its three-tier, consumption-based system with a flat rate charged to all water users to encourage, in part, more watering of flowers, gardens and lawns.

But Port Angeles uses only about 10 percent of its municipal water right, where Sequim may feel a pinch on its water supply within the next decade.

New water rights for the city’s supply is part of that list of pending capital improvements.

“We are more than a decade from reaching that critical point,” Haines said.

“But we need at least a decade to prepare for those kinds of changes.”

________

Sequim-Dungeness Valley Editor Joe Smillie can be reached at 360-681-2390, ext. 5052, or at jsmillie@peninsuladailynews.com.

Senior Reporter Paul Gottlieb contributed to this report.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading