Officials from the Jamestown S'Klallam Tribe

Officials from the Jamestown S'Klallam Tribe

Railroad Bridge over Dungeness River may be accessible soon, but trestle to remain closed for months

SEQUIM — A little more than a week after closure of the flood-damaged trestle, plans are underway to open a kind of viewing deck on Railroad Bridge.

On Feb. 6, heavy rain and a rushing Dungeness River pulled away pilings and a truss section of the iconic bridge’s western trestle, prompting the Clallam County Sheriff’s Office to close the entire span.

“The decking was just hanging there,” said Powell Jones, director of the adjacent Dungeness River Audubon Center.

The Jamestown S’Klallam tribe owns Railroad Bridge Park, the property surrounding the bridge at 2151 W. Hendrickson Road, and sent in Jamestown Excavating to stabilize the trestle with cables.

“No more has fallen in [to the river]; all of the parts we were worried about have been secured,” said Jones.

Until the closure, Railroad Bridge was a well-traveled passage of the Olympic Discovery Trail, the car-free pathway that runs through parts of Jefferson and Clallam counties.

The main Railroad Bridge, at 150 feet in length, is undamaged; it’s the trestle — the west-side walkway onto the bridge — that’s broken apart.

Yet while that will be closed for months, “we want to open the bridge,” Jones said, “so people can come up onto it,” possibly by the end of this week.

“It’s everyone’s trail,” he said.

Visitors still will not be able to cross the bridge, since the trestle will stay closed.

Meanwhile, Jamestown S’Klallam environmental planning manager Hansi Hals reported that, in the wake of this winter’s storms, the Dungeness River has moved over.

“The main channel is now west of where it had been,” Hals said.

“This stretches back to the December time frame,” when a few alder trees came down.

Then, in the first week of February, the rain felled more trees: alders and a massive cottonwood. This pulled away the bank, making way for the wild Dungeness to change course.

It was the power of the river, which flows steeply down from the Olympic Mountains, that undermined the trestle — “hydraulics,” Hals said.

The main Railroad Bridge pilings are driven far down into concrete in the river substrate, she added, but the trestle’s supports weren’t so deep.

The challenge now, added Jones, is to rebuild the trestle in a way that preserves the Dungeness’ natural flow.

“It calls for a new design. We’re trying to figure out what’s possible — for funding and to free the river,” he said.

Hals said that it will take months to fund the redesign and repair, and that it’s uncertain whether the bridge will reopen in time for the June 7 North Olympic Discovery Marathon, run on the Discovery Trail from Sequim to Port Angeles.

For cyclists riding the trail now, Clallam County Road Department Engineer Ross Tyler recommends using U.S. Highway 101 as a detour, joining it from Carlsborg Road on the west side of the Dungeness River and River Road on the east side.

For equestrians, a detour to Old Olympic Highway’s bridge over the Dungeness is a better choice, Tyler said.

Come rain or come shine, Railroad Bridge is one of the most popular stretches of the Discovery Trail. According to the Dungeness River Audubon Center’s electronic counter, last month saw 9,783 crossings by pedestrians, cyclists and equestrians.

________

Features Editor Diane Urbani de la Paz can be reached at 360-452-2345, ext. 5062, or at diane.urbani@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading