Kevin Mason’s Raccoon Lodge shows a decorated face to Clay Street in Uptown Port Townsend. (Diane Urbani de la Paz/for Peninsula Daily News)

Kevin Mason’s Raccoon Lodge shows a decorated face to Clay Street in Uptown Port Townsend. (Diane Urbani de la Paz/for Peninsula Daily News)

Raccoon Lodge given another extension

Port Townsend officials say art piece must be code compliant

PORT TOWNSEND — The decision over what’s to be done with a popular public art piece in Port Townsend known as the Raccoon Lodge was given another extension, this time until Jan. 27.

The piece — a house-like structure on the front of an old tree stump on Clay Street — drew an outpouring of public support after City of Port Townsend officials notified the piece’s builder, Kevin Mason, that the tree was in the city’s right of way and must get a permit or come down.

Mason was notified in late October he would have to begin to bring the piece into compliance with city code or remove the structure and was given until Nov. 30 to make a decision. That deadline was extended to Dec. 30 — today — but Mason said Thursday the deadline had moved again to Jan. 27.

“The neighbor — the tree itself is on their property more than mine — they have a big say in this,” Mason said. “They have to have a say; it’s on their property. They’ve been out of town and they have not arrived yet.”

The Raccoon Lodge is affixed to the stump of what was once the largest recorded Monterey Cypress in Washington but which broke in half in 2018. The stump straddles the property line between Mason’s property and the neighbor, but it’s also close enough to the city sidewalk to put it in the public right of way, which means it has to be compliant with city code, officials said.

Even city officials admit that can be a heavy lift, and once the structure is permitted, it must be insured as a public art piece.

Mason, who’s 75 and been receiving chemotherapy treatment, previously told PDN he doesn’t have the money or the energy to go through the process of permitting the structure. But several professionals have offered their services, including a professional engineer who has written a report asserting the integrity of the Raccoon Lodge’s construction, Mason said.

A retired professional carpenter, Mason said he built the Raccoon Lodge to professional standards and disagrees with the city’s claim the structure could be a danger during high wind events.

But even once the structural integrity of the piece is verified and the proper permits obtained, city code requires art pieces in the public right of way must be managed and insured either by the city or a private organization.

In November, the city sent Mason a request for a voluntary compliance letter detailing five options for the future of the structure with an extended deadline of Dec. 30.

On Thursday, Emma Bolin, Port Townsend director of Planning and Community Development, said the city had received an incomplete building permit application, submitted by Harold Anderson of Quadra Engineering on Mason’s behalf, but that the city still needs confirmation from the neighbor.

Anderson could not be reached for comment Thursday.

“We sent them a fee estimate and some things we would need clarification on,” Bolin said.

The city had estimated total building permit fees to be $223, Bolin said, but those fees are set to increase in 2023. In addition to the application, a site plan and a construction plan are needed for a complete application.

Bolin said city staff sent an email to Mason and the neighbor stating the application had been received, but both parties still had until Jan. 27 to come to a final decision. The city will need written confirmation from both Mason and the neighboring property owner, she said.

According to the email sent to the property owners, the site plan submitted by Anderson included additions to the Raccoon Lodge such as a roof over the tree stump. The city has been working with the property owners on a path forward for the existing structure, the email said.

Other additions included in the submitted plan would fall solely on Mason’s private property, the email said, and would be treated as another matter.

City staff noted in the email that in addition to a building permit and engineering, there is a public arts review process required by city code.

“The building permit application can be put on hold until owners of both properties submit their decision to the City,” the email said.

“Once a decision has been made, the City will inform the property owners of next steps and required documentation based on the option selected.”

________

Reporter Peter Segall can be reached at peter.segall@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading