Port Townsend Paper seeks comment on biomass ‘clean’ power plan

PORT TOWNSEND — The public can comment on a proposed state order that would clear the way for a cogeneration project using wood chips at the Port Townsend Paper mill.

The project, in which the mill’s main boiler would be converted to use waste wood from the Olympic Peninsula, is intended to generate “clean” power while cutting some emissions — although slightly increasing two others — and providing enough electricity to sell.

The waste wood would “come from the forest slash in that vicinity,” much of which is now burned in the field, said Merley McCall, manager of the industrial section of the state Department of Ecology.

“It’s better to burn it in the boiler than in the slash because we have controls on that,” McCall said.

Effect on emissions

The conversion would result in a drop in the amount of nitrogen oxides, sulphur dioxides and particulate matter the mill emits, McCall said.

It would create a small increase in carbon monoxide and volatile organic compounds, McCall said.

Ecology opened the public comment period Friday on its “notice of construction” and will accept written comments through Aug. 18.

Ecology also has scheduled a public hearing on the proposed order at 6:30 p.m. Aug. 17 at the Fort Worden Commons, Company A.

Roger Loney, Port Townsend Paper mill senior vice president and mill manager, was not available for comment Friday.

Create jobs

In the past, mill officials have said the project would help the mill retain its existing 209 jobs while creating 108 temporary jobs.

The mill expects to begin construction by the end of the year, with the new system to be in operation by mid-2012, according to a mill brochure.

No information was available on the cost of the project, but the mill brochure said that about $10 million in pollution control equipment would be added as part of the upgrade.

Ecology’s order sets limits to such pollutants as particulate matter, nitrogen oxides and sulphur dioxides and sets carbon monoxide limits, McCall said.

“We’re putting new controls on the boiler to meet the new limits,” using reasonably available control technology, or RACT, he said.

The mill’s cogeneration plans call for the installation of a new turbine powered by steam from power boiler No. 10 and the recovery furnace.

After passing through the turbine, the remaining steam would be used to support mill operations.

Energy to sell

The mill, in a brochure, said the biomass cogeneration project would provide 200 million kilowatt-hours of alternative energy to the power grid annually.

“This is enough energy to support 15,500 homes annually,” the brochure said.

A power sales agreement is being developed, it added.

The state order, which is expected to be issued in September after public comment has been reviewed, would approve the mill’s proposed cogeneration project for producing for sale up to 25 megawatts of electricity from a renewable source, Ecology said in a prepared statement.

To sell electricity as “green power,” the mill must limit the amount of fuel oil it uses and would use less than it does now, McCall said.

“What they do use will be for start-up,” he said.

The mill has two boilers. The primary boiler would be converted to wood chips, while a second boiler runs on fuel oil, McCall said.

In October, the Port Townsend Paper Corp. mill was awarded a $2 million Renewable State Energy Program grant from the state Department of Commerce to upgrade its biomass cogeneration boiler and plant.

The state dispersed federal money from the American Recovery and Reinvestment Act.

Port Townsend Paper also agreed to leverage $53 million in additional funding to match the grant.

Loney said then: “We have produced alternative energy from biomass for many years and are pleased that this project will increase our electricity generation capacity and make it available to the public.

“This project will reduce greenhouse gases and our dependency on foreign fossil fuels,” he said.

Biomass cogeneration also is being considered at the Port Angeles Nippon Paper Industries USA Ltd. paper mill, which announced in January that it was conducting a feasibility study on a $50 million cogeneration plant using slash.

Air emission limits and other requirements the Port Townsend Paper mill must meet are included in the proposed order and would be incorporated into the mill’s air operating permit when the cogeneration project is completed and operating.

The proposed order for the Port Townsend Paper mill is posted on Ecology’s website at www.ecy.wa.gov.

Copies are available at the Port Townsend Library, 1220 Lawrence St.

Written comments can be mailed, e-mailed or faxed to Ecology.

Mail comments to Marc Heffner, Department of Ecology, Industrial Section, P.O. Box 47706, Olympia, WA 98504-7706.

E-mail comments to Mhef461@ecy.wa.gov or fax them to 360-407-6102.

Ecology officials said they will read the comments and determine if any changes to the proposed order are needed. The comments and responses will be completed and available to the public when a decision on the order is made.

_________

Managing Editor/News Leah Leach can be reached at 360-417-3531 or leah.leach@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading