Port Townsend City Council, Planning Commission consider land use

Participants note preferred language for comprehensive plan draft

PORT TOWNSEND — The Port Townsend City Council and the city’s Planning Commission discussed land use updates being considered for the city’s comprehensive plan.

The council and the Planning Commission were joined by Long Range Planner Adrian Smith, who led the group in editing a 32-page land use element draft during a joint meeting on Monday.

Based on discussion, Smith edited a section header titled “Challenges, Issues, & Opportunities” through a few iterations in real time before settling on “Challenges & Opportunities.”

“Port Townsend faces a unique set of land use challenges in its comprehensive planning, primarily driven by the need to balance growth with its distinct character and environmental sensitivities,” the draft reads. “A significant hurdle is affordable housing, which demands increased housing options while confronting limited available land and a strong desire to preserve the city’s historic form and natural beauty.”

These tensions often lead to difficult conversations about density and infill development, the draft continues.

“Expanding housing supply can clash with community concerns about neighborhood scale, preserving open space, and infrastructure capacity,” it said.

Viki Sonntag, a member of the Planning Commission, argued for the importance of highlighting displacement as a key focus in the city’s land use plan.

A subsection titled “Housing Affordability and Availability” was replaced with a section titled “Housing Affordability, Availability, and Displacement” in a section of land use challenges faced by the city.

The section received initial edits from Smith which further noted the need for the city to consider how housing policies would address displacement, precarity, economic inequality, gentrification and sprawl.

“There is an issue that comes up repeatedly when we’ve been doing our qualitative housing needs assessment, which is that, with the insecurity in housing, all of the burden of that makes people’s lives a lot more fragile across domains,” Sonntag said. “It’s an outcome that increases economic inequality. I find it very distressing because we hear people making the choices between healthcare and living in a house. It’s very complicated. Food is another one.”

Sonntag also suggested the need to place more focus on the increasingly older population of Port Townsend and the particular accompanying challenges.

“I think we need to reference the high concentration of seniors as one of the significant challenges,” Sonntag said.

Smith added a header for demographic challenges,referring to the high population of seniors, presumably to be drafted at a later time.

Also, the document introduces a distinct future land use map (FLUM). In the past, Smith said, the city’s zoning map and FLUM have been the same document.

Having a single map for zoning and future land use can be overly complicated to read, Smith said.

The inclusion of the FLUM consolidates the number of residential land use designations from four to two, lower intensity and higher intensity, according to the document. In addition to simplifying the map, it allows for more flexibility when updating zoning or approving projects.

Bly Windstorm said in a public comment that he appreciated attention paid to bringing agricultural language into the corresponding section, but he did not think the plan put adequate emphasis on the importance of utilizing the city and not just the county for food growth.

“We have seen with housing what can happen when we do not anticipate the future and do not adequately prepare,” Windstorm said. “The paragraphs seem more focused on the county’s contribution than on describing the assets and opportunities that exist within our city to contribute to the food systems’ infrastructure future residents may have to depend upon.”

Port Townsend sits above a ground aquifer, which could supply water to farms through lengthy droughts, Windstorm said.

The comprehensive plan, required of cities and counties under the state’s Growth Management Act, is the central document used to guide Port Townsend’s long-term land use, housing, infrastructure and environmental planning. It covers a 20-year planning horizon and it is updated every 10 years.

The previous comprehensive plan update was completed in 2016 and the current update must be completed by the end of the year.

________

Reporter Elijah Sussman can be reached by email at elijah.sussman@sequimgazette.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading