Port of Port Townsend considers new hoist

Grant could bring $2.3 million in matching funds

PORT TOWNSEND — Port of Port Townsend commissioners will continue deliberating the purchase of a new boat hoist that would replace the port’s 27-year-old, 300-ton Travelift that officials said is nearing the end of its useful life.

Commissioners Pam Petranek and Pete Hanke moved from Wednesday’s consent agenda to regular business a resolution authorizing the port to apply for $2,345,833 in federal funds through the U.S. Economic Development’s Economic Adjustment Assistance Disaster Recovery Program to pay for 80 percent of the $2,932,292 cost of a 300CII Marine Travelift with a variable width option.

Commissioner Carol Hasse had an excused absence.

The EDA funding would cover 80 percent of the cost and the port would pay the remaining 20 percent, or $586,458, in matching funds.

The discussion will continue at the port’s June 14 meeting.

The variable lift option, which became available on Marine Travelift boat hoists this year, would allow the port to maximize service and storage space at the boatyard by being able to block vessels closer together.

“This is a tool that offers flexibility in the yard and the ability to move more boats into the yard,” port Executive Director Eron Berg said.

Deputy Director Eric Toews said the new lift would address vulnerabilities posed by the port’s existing 300-ton Travelift, which requires more frequent and extended down time for repairs that negatively impacts marine businesses and the yard’s operation.

It would also benefit the marine trade industry, he said.

“We’re retaining jobs and creating new job opportunities,” Toews said.

During public comment, Port Townsend Foundry owner Pete Langley said he had questions about the safety of a variable width lift and that there is a need for more community input on the issue.

“Close stacking up of yachts or working vessels become a domino effect in the time of a fire, and I would be concerned putting boats that are working and operating that close together without a viable plan,” Langley said. “I would look for a little bit more time for comment or discussion.”

Toews said, “I wouldn’t characterize it as tight stacking vessels. It’s more an efficient use of limited space.”

Hanke said the Travelift would be a “serious leg up for the the port.”

“I don’t really see a down side,” Hanke said. “We do need a new lift, and we if lost the lift we have, that’s going to be a really dramatic event.”

Petranek said that even though the lift has “all the bells and whistles,” she wants more information before she makes any decision.

“I’m not ready to push the button on a Travelift that hasn’t been on the market yet,” she said.

Commissioners also approved up to $250,000 in Industrial Development District funds for a feasibility study for the Water Walk and Sea Level Rise project that will protect the boatyard from flooding. The port had originally estimated the cost of the initial phase would be $150,000. However, it revised that estimate to between $300,000 and $400,000 based on what it believes will be a significant level of public engagement needed.

In other news, Dave Nakagawara will join the port on June 1 as an engineer and reunite him with capital facilities Director Matt Klontz, with whom he worked when Klontz was Sequim’s public works director.

Nakagawara, who will leave his position as a building official with the City of Port Townsend, will assist Klontz in delivering projects, including Boat Haven and Point Hudson breakwater replacements, expansion of the boatyard and improvements to the Jefferson County International Airport.

________

Reporter Paula Hunt can be reached at paula.hunt@soundpublishing.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading