Port of Port Angeles receives federal grant for infrastructure project

Funds to improve only water interface on Olympic Peninsula

PORT ANGELES — The Port of Port Angeles has been awarded an $8.6 million federal grant from the Department of Transportation Maritime Administration Port Infrastructure Development Program.

“The Port of Port Angeles is thrilled to have been awarded this grant to assist in the repair and improvements to its industrial waterfront at its Intermodal Handling and Transfer Facility (IHTF),” said Connie Beauvais, president of the Port of Port Angeles commission, in a press release.

The IHTF is the only industrial facility with a water interface on the North Olympic Peninsula that can process whole logs coming from Canada and Alaska. It also moves logs from the Peninsula to manufacturers across the Pacific Northwest using barges.

The IHT facility has become vital to the freight infrastructure on the Peninsula, directly supporting domestic manufacturing, timber industry jobs and economic development.

Much of the grant will be used to complete structural repairs and improvements to an existing 112-year-old dock as well as pavement improvements to increase the surface elevation and load capacity for about 10 acres of an existing 30-acre cargo yard, according to the Port of Port Angeles.

“There are two pieces to this funding program,” said Geoff James, executive director for the port. “We actually submitted for two parts.

“One is for the refurbishment of our coffer dam, a sheet pile structure that allows us to bring up a barge alongside the land to load wood onto it.

“The other is to improve the surface of about 10 acres of the eastern portion of the log yard to allow for better flow of stormwater,” he said.

Both James and Beauvais said these repairs will improve efficiency and offer expansion opportunities.

“The project will improve efficiency, expand opportunities for other uses and improve the water quality of stormwater runoff at the facility,” Beauvais said. “This port asset facilitates the efficient movement of material on and off the North Olympic Peninsula via waterborne transportation, which benefits our local community by reducing transportation costs and removing trucks off Highway 101, which reduces 610 tons of CO2 emissions annually and improves safety.”

“The big thing is really to gain more efficiency,” James said. “If you’re driving around on an uneven and unapproved surface, it’s very hard on the machines. The stuff coming off the wood we can’t use for fuel because it has dirt in it so a lot of that ends up being waste.”

The port expects the permitting, consultations and assessment processes necessary for the refurbishment project to be completed by the end of 2025, with construction to start in spring 2026. The project is anticipated to be completed later that fall.

Although James anticipates the project will get matching funds from the state, he said the port is prepared to provide those funds.

The federal funds were supported by Sens. Patty Murray and Maria Cantwell as well as Rep. Derek Kilmer, who advocated for the funding in a letter to DOT Secretary Pete Buttigieg.

“This announcement is about jobs,” Kilmer said. “I grew up in Port Angeles and know how much we can benefit from federal infrastructure investments to strengthen economic opportunity here. That’s why I’ve been advocating for the federal government to invest in Port Angeles and in the future of this region’s economy.

“Making improvements to port facilities so we can grow jobs in our region shouldn’t fall on the backs of local taxpayers. The federal government ought to help. This is big news for our region.”

________

Reporter Ken Park can be reached by email at kpark@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading