Port of Port Angeles officials cut projected deficit

PORT ANGELES — Port officials have reduced a projected deficit in a preliminary budget that remains in the red because of a $1 million dredging project at the Port Angeles cargo terminal.

Port of Port Angeles commissioners reviewed Tuesday a second draft of the 2020 budget that shows $9.4 million in operating expenses and $8.8 million in operating revenue for a projected deficit of $545,899.

“Right now, after we deduct the $1 million dredging, we’re at a net operating surplus of about $450,000,” port Director of Finance and Administration Melinda Smithson told the three commissioners Tuesday.

An initial draft of the preliminary budget that commissioners reviewed Oct. 8 showed a $773,951 operating deficit.

“The second draft of the 2020 operating budget includes an increase in the operating surplus of $228,052, with the operating surplus ending at (minus) $545,899,” Smithson said in a Tuesday memo.

“After deducting the $1 million in dredging costs, the operating surplus before depreciation is $454,101. Although the dredging costs are not capital, the funds to pay for the cost will be taken from capital reserves.”

The preliminary draft budget is available on the Port of Port Angeles website, www.portofpa.com.

Click on “Agendas” and download the Oct. 15 port commission meeting packet.

Projects

Port commissioners will receive a proposed budget on Tuesday and conduct a public hearing on the 2020 spending plan Nov. 5.

A final budget will be adopted Nov. 13.

The $1 million dredging project will deepen the berth at Terminal 3, where cargo vessels are loaded to transport logs overseas, to 45 feet below sea level.

The area was last dredged in 1976.

Sediment has slowly built up in recent decades, causing concern for some large vessel captains, port officials said.

Port Director of Engineering Chris Hartman said the $1 million estimate is a solid number.

“It’s a pretty straightforward project,” Hartman told port commissioners Tuesday.

“The design is there. Permitting is there. So there’s not a lot of unknowns with the project.”

In a later interview, Hartman said the dredging would allow cargo ships to use terminal for the next 30 to 40 years.

“There’s a really slow sedimentation rate within the harbor, which is very fortunate for us,” Hartman said.

Port officials project to end this year with a $379,845 operating surplus, according to a budget spreadsheet.

“In other words, we’re within a hundred grand from year to year by taking the dredging out,” port Commissioner Steve Burke said.

The proposed budget provides a 2.5 percent Consumer Price Index wage increase for port employees.

Commissioners Connie Beauvais, Colleen McAleer and Burke reached a consensus Tuesday on the $86,500 expenditure for the raises.

Burke and McAleer directed staff to include in the proposed budget the 1 percent property tax levy increase as allowed by state law.

Beauvais said she favored raising the levy to an amount equal to the cost of new construction rather than taking the full 1 percent.

“I’m still ‘yes’ on new construction and ‘no’ on 1 percent,” Beauvais said.

Burke said the port had done its best to reduce costs and was “still at a negative.”

“I think from a financial prudence standpoint, I don’t see how you not take 1 percent when you’re running at a deficit,” Burke said.

________

Reporter Rob Ollikainen can be reached at 360-452-2345, ext. 56450, or at rollikainen@peninsula dailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading