Port of Port Angeles may refund bonds, save $300,000 in interest

Karen Goschen

Karen Goschen

PORT ANGELES — The Port of Port Angeles stands to bank more than $303,000 in interest it needn’t pay on bonds it issued 10 years ago.

What port commissioners probably will do at their Sept. 8 meeting is to exercise their right to “call” the bonds and refund them with a loan from Umpqua Bank.

They introduced the refunding resolution Tuesday and expect to approve it in two weeks.

Instead of paying 4.15 percent to 4.75 percent interest through 2025, they’ll probably pay 2.4 percent to Umpqua Bank if loan rates remain at near-record lows — and keep the difference.

Umpqua’s interest rate was lower than that quoted by KeyBank, which also answered the port’s request for proposals, said Karen Goschen, the port’s finance director.

Not including a 5 percent refinancing fee, refunding will save the port about $37,000 a year, according to Scott Bauer of A. Dashen and Associates of Bellevue, the port’s independent registered municipal adviser.

Standard option

Issuers of general obligation bonds are permitted to “call,” or refinance, them midway to maturity.

The port issued the bonds in 2006 to pay for improvements at the Port Angeles Boat Haven. They otherwise would mature in 2025. Instead, they will be retired Dec. 1.

The savings actually will come in the form of property taxes the port collects throughout Clallam County.

Because the windfall comes from taxes, not from revenues, the unspent interest must be earmarked for capital spending, Goschen told commissioners.

The debt still will be backed by the port’s “full faith and credit,” said Cynthia Weed of K&L Gates LLC in Seattle, the port’s bond counsel.

As for the Portland, Ore.-based Umpqua Bank, whose Port Angeles branch is located at 1033 E. First St., it’s “unlikely” to resell the loan, as it legally can to another financial institution, Weed said.

“They want this bond as part of their community commitment,” she said, “and they’ve made that clear.”

Headline news

In other action Tuesday, commissioners approved a $169,070 professional services agreement with BergerABAM of Seattle to design a headline dolphin and replace timber trestles at Terminal 3.

Cargo ships, mostly log carriers, currently tie up at the 300-foot-long dock with bow lines they wrap back aft to the dock like spring lines.

Port Executive Director Ken O’Hollaren called the arrangement “very unusual” and said it limits the size of vessels that can use the terminal, which could someday berth cruise ships.

The new dolphin would be a freestanding structure west of the terminal.

Terminal 3 was built in the 1960s and underwent a reconstruction by BergerABAM in 1985.

KPly cleanup

Commissioners also approved a change order in cleanup of the former KPly mill site where contractors are excavating contaminated soil and sending it to landfills.

Because they found contaminated water 2 to 4 feet below the surface, remediators must rent equipment to remove gasoline, diesel fuel and oil before pumping the water into Port Angeles city sewers.

Cost of renting, installing, supplying and operating the system will add $141,703 to the cleanup cost but will be paid by the port’s insurers, port staff said.

A month ago, commissioners increased their contract with Alberbrook Quarry of Chehalis by $34,409 after contractors dug up 2,178 more tons of concrete than they expected.

Total cost of the cleanup of the site on Marine Drive now stands at $3,716,717.

“We’re committed to doing this job right,” said Commissioner John Calhoun, “in addition to doing it quickly.”

The 19-acre site of the mill that also operated as PenPly is considered a prime location for marine industries.

_______

Reporter James Casey can be reached at 360-452-2345, ext. 5074, or at jcasey@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading