Traffic makes its way along South Race Street in Port Angeles on Thursday. City officials are examining plans to improve the busy corridor while making it friendlier to pedestrians and cyclists. (Keith Thorpe/Peninsula Daily News)

Traffic makes its way along South Race Street in Port Angeles on Thursday. City officials are examining plans to improve the busy corridor while making it friendlier to pedestrians and cyclists. (Keith Thorpe/Peninsula Daily News)

Port Angeles seeks input on Race Street redesign

PORT ANGELES — The gateway to Hurricane Ridge is getting a face-lift.

The city of Port Angeles plans to turn Race Street into a “multi-modal corridor” for pedestrians, bicyclists, vehicles and transit users, and it wants your input on the design.

A public forum on Race Street corridor design concepts is set for Tuesday, Sept. 12. The forum will be from 4 p.m. to 7 p.m. at the Port Angeles Senior &Community Center, 328 E. Seventh St.

City staff and a project consultant will be on hand to answer questions about design alternatives for the grant-funded project.

“This is an opportunity for residents, businesses and interested stakeholders to share their thoughts and provide feedback on the design efforts to date,” a city announcement said.

Meanwhile, the city is seeking public input on the Race Street design project through an online survey.

The community survey can be accessed on the city’s website, at www.cityofpa.us.

“We wanted to capture as much public input as we could and in as many different ways as we could,” said Ben Braudrick, assistant planner for the city of Port Angeles, in a Thursday interview.

There are two main options for the project. One has multi-directional bicycle lanes on either side of Race Street and the other has a 12- to 14-foot-wide shared-use trail, much like the Olympic Discovery Trail, on one side of the arterial.

Both concepts would narrow existing vehicle lanes and add planted buffers and sidewalks on both sides.

The project affects the 1.1-mile corridor between Front Street and the Olympic National Park Visitor Center.

The idea is to improve the connection between the Olympic Discovery Trail and Hurricane Ridge and to improve the safety and functionality of Race Street for motorists, cyclists, pedestrians and others.

“We’re trying to do this in a way that will support transportation for everybody from the age of 8 to 80,” Braudrick said.

The Race Street corridor was split into six sections to address existing uses and landscapes.

Later this year, the city and its consultant — Alta Planning of Seattle — will prepare construction documents with a preferred design alternative, city officials said.

The city received a grant from the Federal Lands Access Program to cover most of the $462,000 design cost, Braudrick said in an email.

The Race Street project qualified for the federal program because it will enhance access to Olympic National Park, Braudrick said.

Park officials are working closely with the city on how to manage the area around the Olympic National Park Visitor Center and support the Race Street project, interim park spokeswoman Penny Wagner said.

“It sounds like it will be a big improvement,” Wagner said in a Friday interview.

Narrowing the width of the vehicle lanes on Race Street will not reduce the level of service, or the volume of traffic that the road can handle, but it might reduce speed, Braudrick said.

The current speed limit on Race Street is 30 mph.

Both design concepts for the section of Race Street near Civic Field include a retaining wall at the edge of the stadium property, a 10-foot-wide sidewalk, a 5-foot-wide planted buffer and 7-foot-wide drop-off zone.

“The concept around Civic Field is trying to create more of a park-like atmosphere,” Braudrick said.

The online survey had garnered 55 responses as of Thursday.

Braudrick said the goal is to complete the design phase next spring and to construct the project in 2019.

“We’re really excited about it,” Braudrick said

“I think it’s going to be a great opportunity for Port Angeles, not only for local residents but for visitors as well.”

________

Reporter Rob Ollikainen can be reached at 360-452-2345, ext. 56450, or at rollikainen@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading