Port Angeles landmark to get a new look

PORT ANGELES — A French bakery, wine and cheese boutique, florist and bookstore are expected to begin moving into The Landing mall once the remodeling of the interior is finished by the end of August.

Paul Cronauer, one of the owners of the building at 115 E. Railroad Ave., said that the bakery will be first to move into its new digs at the south end of the building as soon as the place is ready for it.

A month later, the wine and cheese boutique is expected to open its doors, followed soon by the florist and then the bookstore.

Cronauer also is searching for a natural grocery store along the lines of Country Aire to attract people year-round.

Extensive exterior remodeling is planned, but that won’t take place for a year or longer because of several permits yet to be approved.

During exterior remodeling, walkways will be replaced, a new viewing tower will be added and the present salmon pink hue will be painted over.

But before the outside of the mall changes, the owners must get a shoreline substantial development permit from the city of Port Angeles, a hydraulic action permit from the state Department of Fish and Wildlife and a Section 110 permit from the U.S. Army Corps of Engineers.

A public hearing on the shoreline substantial development permit application is set for 6 p.m. Aug. 8 before the Port Angeles Planning Commission in the council chambers at City Hall, 321 E. Fifth St.

Cronauer, a Port Angeles developer, is a partner along with Mark Craig of Seattle, in Port Angeles Landing LLC.

The partnership bought the waterfront landmark from the Port of Port Angeles for $743,360 in October 2006.

The estimated cost of the remodeling project is $1.2 million.

Interior remodeling includes covering the open spaces in the second floor to create more floor space and moving the artwork downstairs to the building’s west wall.

The interior stairwell at the building’s north end will be removed.

When that is done, the 4,500 square feet of retail space upstairs and downstairs will be divided into modular spaces with access to the upstairs parking lot, which doesn’t exist now, Cronauer said.

No major rent increases or replacement of existing tenants is planned, he said.

In fact, an existing tenant that Cronauer wants to promote more is the National Oceanic and Atmospheric Administration’s Olympic Coast Discovery Center.

“It is one of those little jewels no one knows about,” he said.

Exterior changes

A new three-story viewing tower on the building’s southwest corner will provide access to the second story after the current staircase on the building’s south side is removed, Cronauer said.

The viewing tower will allow people to see both ferries without having to walk down to City Pier, he said.

A second story walkway will wrap around the building, including past the existing offices. Doors will open out onto it, Cronauer said.

“The whole face will look more inviting,” he said.

The currently condemned former icehouse dock will be rebuilt and used for fish delivery and a live seafood market, Cronauer said.

Other activities planned for the building’s harbor area include glass blowing demonstrations, a floating dock, float plane terminal and kayaking provided by Adventures Through Kayaking, he said.

“It will continue to be a really great public area,” Cronauer said.

“I want to enhance the building to make it more desirable for the existing tenants and create more foot traffic.”

“I’m sorry for the inconvenience but the end result will be phenomenal,” he said.

Port Angeles Landing LLC was selected by the three-person Port of Port Angeles commission in October 2006 to buy the 2.67-acre waterfront property.

It includes the 46,840 square-foot, three-story building with an elevator, retail space, office and restaurant with two levels of parking for 104 cars.

The building houses several tenants, including Victoria Express, the seasonal passenger ferry to Victoria as well as the Customs inspection area; Landing’s Restaurant and Dockside Lounge; Downriggers Restaurant; Duty Free Store; the NOAA’s Olympic Coast National Marine Sanctuary display and offices, and other offices.

A separate 2,400-square-foot brick building facing Railroad Avenue serves as the Port Angeles Regional Chamber of Commerce Visitor Center.

The building was built in 1985 by Waterfront Associates. Security National Bank foreclosed on the property in 1991.

The port took over management in August 1990 and legal possession in May 1993.

________

Reporter Brian Gawley can be reached at 360-417-3532 or brian.gawley@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading