Port Angeles considering stricter city water curbs to protect fish; other sources studied

Port Angeles considering stricter city water curbs to protect fish; other sources studied

PORT ANGELES — City officials are pondering imposition of stricter, Stage 3 water conservation measures within the next three weeks as the Elwha River flows slower and slower during the North Olympic Peninsula’s rainless summer, Craig Fulton, city public works and utilities director, said Wednesday.

Fulton told City Council members Tuesday that the city also is looking at other options for city water other than the Elwha River so the waterway remains vibrant for fish.

Fulton said the river is flowing at 340 cubic feet per second (cfs) two months ahead of schedule.

On June 17, city officials issued a Stage 2 water emergency, calling for voluntary conservation measures through an intense public information campaign.

Stage 3 measures, under which the council could limit lawn and garden watering to specific hours and days, could be implemented as the waterway approaches 300 cfs, Fulton said.

Fulton said Wednesday there is a 50-50 chance he will recommend at the next council meeting July 21 that council members impose the Stage 3 emergency.

But he said those odds could change if a weather forecast that calls for a chance of rain Sunday and Monday becomes actual precipitation.

He said the city is not in danger of running out of the water drawn from the Elwha.

River water for city residential consumption courses through a Ranney collector well 60 feet below the surface and the National Park Service intake that takes water from the river surface.

But the river flow is expected to drop to 150 to 180 cfs in September.

“At that level, there are going to be fish impacts,” Fulton said.

That limited a flow would cause the water to heat, lower oxygen levels and provide a breeding environment for salmon parasites and bacteria.

The state Department of Fish and Wildlife, which earlier this year curtailed fishing on the Sol Duc River to protect returning chinook, on Wednesday asked anglers to limit fishing to morning hours to reduce stress on fish, land them quickly and immediately release them back into the water.

“We’re seeing some really challenging conditions for fish in streams and rivers, especially for this early in the summer,” Teresa Scott, Fish and Wildlife drought coordinator, said in a statement.

Higher water temperatures and low stream flows also are creating problems at the agency’s hatcheries, Scott said.

She said the department probably will release some hatchery fish early and transport salmon and steelhead that are unable to make it upstream to spawning grounds.

Fulton said Wednesday that evaporation likely cuts the Elwha’s flow by about 20 cfs during the daytime — about double the estimate he used at Tuesday night’s meeting — while the city consumes about 3.5 cfs daily.

Some of that water returns at night as the river basin recharges the flow, Fulton said.

But only some.

“It’s on a continual downward trend,” he said.

Fulton was hopeful the city could obtain drought-relief and fish-impact grants to seek alternative water sources as the dry weather continues.

He has entered preliminary discussions on seeking new sources with Robinson Noble Inc. of Tacoma, which specializes in hydrogeologic, geotechnical and environmental consulting services.

One alternative being reviewed — no contracts have been signed — is putting wells into existing aquifers, Fulton said.

The goal would be “to make our water system more robust going into the future,” Fulton told council members.

________

Senior Staff Writer Paul Gottlieb can be reached at 360-452-2345, ext. 5060, or at pgottlieb@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading