Port Angeles city utility bills likely to increase in 2010

PORT ANGELES — Residents will pay an average $7.77 more each month next year for their utilities if proposed rate increases are adopted by the City Council on Oct. 20.

The increases, proposed by city staff, involve the water and wastewater utilities.

City staff are proposing that electrical, storm water, and garbage collection rates remain the same in 2010.

The highest increase would be in the city’s “combined sewer overflow” wastewater charges.

That rate is proposed to increase by $3.10 a month, or about 30 percent.

The standard wastewater fee is proposed to increase by an average of $1.50 a month, or 4 percent.

The base water and water consumption fees are both proposed to increase by 8.5 percent.

That means that residents would pay $2.10 more a month to be connected to the water utility, and on average, they would pay an additional $1.07 a month for water consumption.

New treatment plant

Glenn Cutler, city public works and utilities director, said the proposed changes to the water utility mainly stem from the new water treatment plant that the National Park Service will transfer to the city sometime in December.

The plant is under construction east of the city’s garbage transfer station.

The treatment plant, built by the park service, would filter silt from drinking water that will be released when the two Elwha River dams are removed in 2011.

It would also cost the city approximately $234,000 a year to operate, Cutler said.

The wastewater fee increases are due to capital projects that the city has planned for that utility next year, debt service and increased costs in benefits for employees, he said.

Combined sewer overflow fees charged to wastewater utility customers are used to pay back loans from the state Department of Ecology.

The loans fund a project that could cost up to $42 million to place the city in compliance with Ecology’s requirements.

Cutler said the fees, which are increased incrementally each year, will last for another 25 to 30 years.

Combined sewer overflow refers to portions of the city’s sewer system where sewage and storm water flow through the same pipes.

During heavy rainfall, the stormwater overflows the containment barriers in those pipes and sends untreated effluent into Port Angeles Harbor.

Ecology is requiring that the city reduce overflow incidents from the 30 to 100 a year that it currently has to no more than four by 2016 or face fines of $10,000 a day.

The city intends to use a 5-million-gallon tank on Rayonier Inc.’s former pulp mill site to store the sewage that would otherwise overflow into the harbor, and then drain it into the Port Angeles Wastewater Treatment Plant adjacent to the property.

The city expects to acquire the tank when the Port Angeles Harbor-Works Development Authority buys Rayonier’s property sometime around August 2010.

________

Reporter Tom Callis can be reached at 360-417-3532 or at tom.callis@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading