Port Angeles airport without instrument landing system

PORT ANGELES — A bit of fog is not always enough to ground aircraft, but this week it has resulted in the cancellation of 15 Kenmore Air flights at William R. Fairchild International Airport because of the temporary absence of an instrument landing system.

The landing system, which guides aircraft to the runway, has been out of commission since June 21 while the Federal Aviation Administration upgrades its antennae and other equipment, said Port of Port Angeles Aviation Director Jeff Robb.

The work will be complete Tuesday or Wednesday, he said.

Craig O’Neill, Kenmore Air marketing director, said the company would have been able to make those canceled flights as long as it could have used the landing system.

A layer of fog during each of those mornings made it unsafe to land without one.

The fog resulted in cancellations of departures as well as arrivals, because the aircraft must be able to land safely at the airport if it needs to return mid-flight, O’Neill said.

“It’s bad news,” he said.

“We’ve done a lot of refunding over the last few days.”

O’Neill said he couldn’t estimate how much the cancellations have cost the company.

Jeff Well, owner of Rite Bros. Aviation, said the absence of the landing system has resulted in the cancellation of one chartered flight for his company.

O’Neill said the aircraft can use a global position system to locate the runway during poor weather, but there still has to be a certain level of visibility.

He said a GPS approach requires a 1,000-foot ceiling with 3 miles of visibility on the ground.

Using the instrument landing system requires a minimal ceiling of 200 feet with a mile of visibility on the ground.

Robb said the upgrade to the landing system is an FAA project, so he couldn’t say Wednesday evening how much it costs.

He said the project was initially scheduled for September, but the port got it moved to early summer when there is less of a chance of poor weather, such as fog.

“It was probably the best window that we wouldn’t have poor weather conditions,” Robb said.

“Of course, this morning we were weathered in.”

The landing system, he said, is at least 20 years old.

Robb said the landing system was in compliance with FAA regulations.

“The system worked OK before; they just couldn’t get parts for it,” he said.

“They were scavenging parts from all around the nation to keep the system going.”

He said the FAA didn’t want to risk a catastrophic failure because of lack of parts. New parts will be more readily available with the upgrades.

The upgrades also provide for a more stable frequency, Robb said.

Robb added, “There’s no perfect time” to do this work.

“But it had to be replaced.”

________

Reporter Tom Callis can be reached at 360-417-3532 or at tom.callis@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading