ON THE WATERFRONT — Port Angeles’ Armstrong Marine a flurry of activity

I recently visited with Perry Knudson, who directs the international sales and marketing programs for Armstrong Marine in the company’s manufacturing facilities at the site of the former Port Angeles Speedway on U.S. Highway 101 midway between Sequim and Port Angeles.

Their shop is bursting at the seams with projects in differing stages of construction.

Armstrong Marine, with input from noted naval architect and marine engineer Tim Nolan, has developed a line of aluminum pilot boats for use in both protected waters and exposed ocean transfers.

The vessels, known as JL Series Pilot Boats, come in three lengths: 42 feet, 52 feet and 62 feet.

The boats are diesel-powered with water-jet propulsion.

One of the projects Armstrong is working on is a 35-foot catamaran that will be used as a whale-watching boat by Outer Island Expeditions in the San Juan Islands.

Perry said the vessel will also be used as an emergency response boat pursuant to a contract with the boat’s owner and a local fire department.

Another of the projects Perry showed me was a 50-foot catamaran with two state rooms and a full-service galley that is powered by Scania Marine Diesel. Propulsion is via Hamilton Waterjets.

Perry said that the Alaskan owner enjoys hunting and fishing in areas where others can’t go.

The final project Perry showed me was a 35-foot catamaran tour boat whose hailing port will be Hanalei Bay on the island of Kauai.

The vessel carries two dozen passengers and is named Kamahele Kai II.

This week Perry, along with sales and marketing colleagues Josh Armstrong and Charlie Crane, are attending the International WorkBoat Show in New Orleans to attempt to drum up even more business for their company.

I spoke briefly with Crane, who told me he has seen Darryl Wakefield, president of Westport LLC, and Eric Schneider and Joe Beck of Lee Shore Boats at the show.

Thanksgiving Day Global Heart, a 585-foot Panamanian-flagged cargo ship, recently moored to the Port of Port Angeles’ Terminal 3 for 1.8 million board feet of softwood logs that were harvested from private lands in Western Washington.

The vessel made her way to Port Angeles after having first received 2.7 million board feet of logs at the Port of Aberdeen.

The fully loaded vessel left Port Angeles on Wednesday bound for Lanshan, China.

On Monday, Tesoro petroleum provided bunkers to Bulk Chile, a 623-foot bulk cargo ship that was on its way to Aberdeen.

Tesoro refueled Ardmore Seatrader, a 599-foot petroleum products tanker, Wednesday. She then got underway for Anacortes.

On Saturday, Tesoro was scheduled to bunker Port Union, a 600-foot petroleum products tanker that is flagged in the Marshall Islands.

Also Saturday, Overseas Boston, a 600-foot petroleum products tanker, was to offload a quantity of dirty diesel to the Tesoro Refueling Barge HMS 2000, which will be taken to the Paramount petroleum storage facility at Point Wells.

The diesel was used to clean the vessel’s fuel tanks and associated lines and is no longer suitable for use in diesel engines, although the dirty diesel fuel could be used to thin down bunker fuel and be consumed as fuel in that fashion.

________

David G. Sellars is a Port Angeles resident and former Navy boatswain’s mate who enjoys boats and strolling the area’s waterfronts. Items and questions involving boating, port activities and the North Olympic Peninsula waterfronts are always welcome. Email dgsellars@hotmail.com or phone him at 360-808-3202.

His column, On the Waterfront, appears Sundays.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading