Olympic Hot Springs Road reopens after three-year closure

OLYMPIC NATIONAL PARK — Olympic Hot Springs Road has been reopened above the Altair Campground after three years of closure.

Olympic National Park announced Friday that the road had been reopened.

It had been closed at the gate just above Altair Campground while contractor crews removed Glines Canyon Dam.

Visitors may now reach the Boulder Creek Trailhead.

The trailhead provides hiker and stock-user access to the Olympic Hot Springs Trail, a 2.5-mile hike from the trailhead.

Glines Canyon overlook

“Access to the Glines Canyon overlook and former Lake Mills will continue to be available only from the Whiskey Bend Road,” said Park Superintendent Sarah Creachbaum.

“Additional work needs to be done before we can safely open the [other] viewpoint and old boat launch, so while the Olympic Hot Springs Road itself is open, the parking area at Glines Canyon is closed,” she added.

An overlook on the east side of Glines Canyon was opened two weeks ago. It includes 10 parking spaces.

The west-side overlook is expected to be opened next spring at the earliest, after fencing and other protective measures are installed and the parking area completed.

Hot springs

The Olympic Hot Springs Trail is also open.

“Extensive restoration work has been done in Olympic Hot Springs area while the road has been closed,” Creachbaum said.

“Visitors are reminded to camp only in designated campsites and to avoid stepping on plants when using the area.”

Park officials also said they want to remind visitors that marijuana use is prohibited on federal lands, including the park.

Before hiking, visitors are urged to check trail conditions at http://tinyurl.com/pdn-parktrails, phone the Wilderness Information Center at 360-565-3100 or drop by park visitor center at 3002 Mount Angeles Road, Port Angeles.

Hikers should be prepared for ice, snow and slippery conditions, park officials said.

The park prohibits open fires in the Olympic Hot Springs area, including the Boulder Creek Campground.

Crystal Creek

The Crystal Creek Bridge is closed to all travel due to extensive rock slide damage, but Crystal Creek can be crossed via a foot log.

Hikers are urged to use caution since the foot log is often icy at this time of year.

The east-side parking area and viewpoint at Glines Canyon can be reached by following the gravel Whiskey Bend Road about 1 mile south from its intersection with Olympic Hot Springs Road.

A 0.3-mile trail built by the Elwha revegetation crew leads from the parking area to the lakebed.

The last remnant of the once-210-foot Glines Canyon Dam, built 13 miles from the river’s mouth, was demolished Aug. 26.

Barnard Construction workers, who took down both the Glines Canyon and Elwha dams on the river in a $325 million restoration project that began in September 2011, finished clearing debris from the channel in late September this year.

Abutments on either side of Glines Canyon were left in place to serve as observation points.

The 108-foot Elwha Dam, 5 miles from the river’s mouth, was removed in March 2012.

Both dams were built without fish ladders. Removal cleared the way for salmon and steelhead to swim upriver to spawn in some 70 miles of river habitat — including tributaries to the 40-mile river.

Fishing of any kind on the river remains prohibited under a five-year moratorium imposed in 2011 to allow its fisheries to recover from the release of sediment introduced by the dam removal.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading