Olympic National Park spokeswoman Penny Wagner updates Forks-area residents on the ongoing construction of U.S. highway 101 around Lake Crescent. (Rob Ollikainen/Peninsula Daily News)

Olympic National Park spokeswoman Penny Wagner updates Forks-area residents on the ongoing construction of U.S. highway 101 around Lake Crescent. (Rob Ollikainen/Peninsula Daily News)

Official: Lake Crescent Highway 101 construction at 30 percent complete

Olympic National Park spokeswoman says the project has entered its most ambitious phase.

FORKS — The three-year makeover of U.S. Highway 101 at Lake Crescent is about 30 percent complete, and crews have begun the most ambitious construction season in the project, an Olympic National Park official said.

Crews this year will concentrate on sub-excavation, milling, paving and erosion control, working their way from east to west along the steep shores of the iconic lake, park spokeswoman Penny Wagner said.

“The lion’s work of what’s happening is this season,” Wagner told 13 West End residents in a community forum in Forks on Thursday.

The $27.5 million federal project to rehabilitate 12 highway miles at Lake Crescent and 4-mile long East Beach Road commenced last summer. The work is scheduled to be completed on Sept. 26, 2019.

This year’s construction season began March 19.

Motorists can expect half-hour delays during work hours on weekdays, with short delays after 5 p.m. to accommodate single-lane, alternating traffic.

This month only, the road will be closed from East Beach Road to Barnes Point on weekdays between 10 p.m. and 4 a.m.

“March is one of the few periods where they can do work at night,” Wagner said, referring to federal protections for endangered species.

“That’s why you’re seeing overnight delays and the nighttime work hours.”

From April 2 through late September, construction can only occur between two hours after sunrise and two hours before sunset.

Limited four-hour closures will happen on weekdays prior to Memorial Day and after Labor Day, Wagner said.

The four-hour closures will be announced in advance and will occur only between 9 a.m. and 1 p.m.

“The contractor needs to continue these deep patches, all this sub-excavation work, and so they’re going to start out in the beginning of April and try to get all 20 of those four-hour closures done,” Wagner said.

“If they can, they’ll do them in a row, all 20. So Monday, Tuesday, Wednesday, Thursday, from 9 a.m. to 1 p.m., the road is closed.”

No construction will occur on weekends or holidays.

The project is being managed by the Federal Highway Administration and the National Park Service.

Strider Construction, Inc., of Bellingham is the primary contractor.

“I know this is difficult,” Wagner said of the inconvenience to West End residents.

“I know the delays are really impacting your lives.”

Olympic National Park is posting updates about the project on a dedicated webpage. Click on http://tinyurl.com/PDN-101delays.

When the highway is closed, drivers can travel to and from the West End by using state Highways 112 and 113 as a detour.

A business owner suggested that a sign be added at the 101-113 cutoff in Sappho to remind motorists that businesses along U.S. Highway 101 remain open.

“We’ll try to come up with a sign that we can put at the detour sign that says ‘Road Closed at Crescent Lake’ to let people know that they don’t have to turn there,” said Marty Flores, on-site project engineer with Western Federal Lands Highway Division.

Ed Bowen of Clallam Bay suggested that the project managers plan for unforeseen circumstances like last year’s rock scaling work near milepost 229, which closed the highway for one week.

Another resident suggested adding banks to the flat S-curves on the west side of the lake.

Crews will add a slight bank in the corners when paving the surface, Flores said.

Wagner reviewed for the audience highlights of last year’s construction.

Crews poured 10,000 tons of asphalt on the highway at Fairholme Hill and 7,000 tons of asphalt on East Beach Road, Wagner said.

“All of East Beach Road paving was completed last year,” Wagner said.

Thirty culverts were installed under the highway and East Beach Road last year. Crews spent a combined 1,000 hours scaling marine basalt from the cliff east of Barnes Point.

“The rockfall work was completed last year, so there won’t be any additional work at the rock wall this year,” Wagner said.

This year, crews plan to sub-excavate 14,000 cubic yards of material from under the road surface.

The road will be milled to a depth of 7 1/2 inches beginning in late April and paved with 5 1/2 inches — or 60,000 tons — of asphalt beginning in May.

“There’s various areas around the lake where we have walls that need to be repaired,” Wagner added.

“That work is ongoing.”

In 2019, crews will install a two-inch asphalt overlay, stripe the road, replace signs, add masonry and improve the Clallam Transit bus stop at Barnes Point, Wagner said.

________

Reporter Rob Ollikainen can be reached at 360-452-2345, ext. 56450, or at rollikainen@peninsuladailynews.com.

More in News

Port Townsend Main Street Program volunteers, from left, Amy Jordan, Gillian Amas and Sue Authur, and Main Street employees, Sasha Landes, on the ladder, and marketing director Eryn Smith, spend a rainy morning decorating the community Christmas tree at the Haller Fountain on Wednesday. The tree will be lit at 4 p.m. Saturday following Santa’s arrival by the Kiwanis choo choo train. (Steve Mullensky/for Peninsula Daily News)
Decoration preparation

Port Townsend Main Street Program volunteers, from left, Amy Jordan, Gillian Amas… Continue reading

Port Angeles approves balanced $200M budget

City investing in savings for capital projects

Olympic Medical Center Board President Ann Henninger, left, recognizes commissioner Jean Hordyk on Wednesday as she steps down after 30 years on the board. Hordyk, who was first elected in 1995, was honored during the meeting. (Paula Hunt/Peninsula Daily News)
OMC Commissioners to start recording meetings

Video, audio to be available online

Jefferson PUD plans to keep Sims Way project overhead

Cost significantly reduced in joint effort with port, city

Committee members sought for ‘For’ and ‘Against’ statements

The Clallam County commissioners are seeking county residents to… Continue reading

Christopher Thomsen, portraying Santa Claus, holds a corgi mix named Lizzie on Saturday at the Airport Garden Center in Port Angeles. All proceeds from the event were donated to the Peninsula Friends of Animals. (Dave Logan/for Peninsula Daily News)
Santa Paws

Christopher Thomsen, portraying Santa Claus, holds a corgi mix named Lizzie on… Continue reading

Peninsula lawmakers await budget

Gov. Ferguson to release supplemental plan this month

Clallam County looks to pass deficit budget

Agency sees about 7 percent rise over 2025 in expenditures

Officer testifies bullet lodged in car’s pillar

Witness says she heard gunfire at Port Angeles park

A copper rockfish caught as part of a state Department of Fish and Wildlife study in 2017. The distended eyes resulted from a pressure change as the fish was pulled up from a depth of 250 feet. (David B. Williams)
Author to highlight history of Puget Sound

Talk at PT Library to cover naming, battles, tribes

Vern Frykholm, who has made more than 500 appearances as George Washington since 2012, visits with Dave Spencer. Frykholm and 10 members of the New Dungeness Chapter, NSDAR, visited with about 30 veterans on Nov. 8, just ahead of Veterans Day. (New Dungeness Chapter DAR)
New Dungeness DAR visits veterans at senior facilities

Members of the New Dungeness Chapter, National Society Daughters of… Continue reading

Festival of Trees contest.
Contest: Vote for your favorite tree online

Olympic Medical Center Foundation’s Festival of Trees event goes through Dec. 25