Not welcome yet: Safety concerns, second thoughts on designs could hold up decision on Port Angeles entry signs

PORT ANGELES — Worries about the safety of a highway location approved for one of two new “Welcome to Port Angeles” monument signs has put the design choices on hold.

City Hall is asking a consultant to develop new designs for the signs that it wants to install at the east and west entrances into town on U.S. Highway 101.

The consultant, AECOM of Orlando, Fla., has developed two concepts thus far.

Both are preliminary, and the final choice of the design will depend on the locations.

Each of the two concepts was displayed at a public meeting on the city’s Waterfront and Transportation Improvement Plan last month.

Neither received overwhelming approval from the public, said Nathan West, city community and economic development director, so the staff want to see other sketches before asking the City Council to select one.

But now the city is putting a hold on new sketches until safety concerns raised by the planned placement of one of the large monument signs at the bottom of the Morse Creek S-curve on Highway 101 can be addressed.

The location is one of two that the City Council selected Tuesday. The other is at the Tumwater Truck Route-Highway 101 interchange on the west side.

Deputy Mayor Don Perry said placing a monument sign next to Morse Creek would distract drivers and might cause wrecks on the notorious S-curve east of town.

West said the city is asking the state Department of Transportation, AECOM, Clallam County and its consultant on the transportation portion of the improvement plan, Fehr Peers, to help determine if it would be a safety hazard.

That analysis may set the project schedule back a bit.

The city has planned to have the council select a design at one of its two meetings next month.

West said that schedule is still “realistic” but also emphasized that it will likely be “impaired.”

“To what extent, I’m not sure at this point,” he said.

If a large sign, possibly 30 feet tall, would be too much of a distraction for drivers at the bottom of the S-curve, the council will be asked to consider other options, West said.

The city is waiting for concerns with the eastside location to be resolved before finishing the design, based on input received at public meetings, he said.

West said the city received a lot of comments encouraging the council to set the locations before choosing the final design so that the scenery can be incorporated into the design.

The design won’t be finished until the locations are firm.

City personnel aim to install the monument signs next year.

Design and construction for the project is estimated at $50,000.

New directional signs approved by the council Tuesday are estimated to cost $225,000.

________

Reporter Tom Callis can be reached at 360-417-3532 or at tom.callis@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading