David Brehm, Jeene Hobbs, Barbara VanderWerf and Ann Soule from the Clallam County League of Women Voters stand with a new sign that shows the level of water flow for the Dungeness River. While the river flow was considered critical on Aug. 23, levels improved slightly to “low” flow later that night. The sign, just west of Knutsen Farm Road on Old Olympic Highway, will be updated weekly, organizers said. (Matthew Nash/Olympic Peninsula News Group)

David Brehm, Jeene Hobbs, Barbara VanderWerf and Ann Soule from the Clallam County League of Women Voters stand with a new sign that shows the level of water flow for the Dungeness River. While the river flow was considered critical on Aug. 23, levels improved slightly to “low” flow later that night. The sign, just west of Knutsen Farm Road on Old Olympic Highway, will be updated weekly, organizers said. (Matthew Nash/Olympic Peninsula News Group)

New sign to display Dungeness River levels

Drought indicator placed on Old Olympic Highway property

SEQUIM — The North Olympic Peninsula remains on alert for a shortage on water despite a bit of precipitation in the past week.

Washington state issued a statewide drought declaration on April 16 with a few large city exceptions as winter conditions were warmer than normal, leading to below-normal snowpack levels.

Both the Dungeness and Elwha rivers are experiencing lower flows than normal, and Clallam County’s Public Utility District (PUD) has declared Stage 2 and Stage 3 drought responses for several water districts.

As state officials monitor water levels and encourage residents to use water wisely, a committee with the Clallam County League of Women Voters has developed a “Low Flow Alert” sign pilot project for the Dungeness River.

“Our goal is to improve awareness that our water supplies are not unlimited — whether or not there are water use restrictions in place,” said Ann Soule, a member of the league’s Low Water Alert Pilot Project committee and retired hydrologist/water planning and policy professional.

The sign, located on private property along Old Olympic Highway with the landowner’s permission, will be updated each week with an arrow and four colors — green for low danger and succeeding colors of yellow, orange and red for lower river levels and more severe drought conditions — to let passersby know how conditions are affecting the Dungeness.

The critical zone (orange) was set for when irrigation managers potentially have to cut back their diversions and when biologists start planning ways to facilitate migration of salmon through shallow channels.

See lwvcla.clubexpress.com/water for more criteria for the sign’s selected “zones.”

“This is giving people a chance to know about our water situation,” Soule told members of the Dungeness River Management Team on Aug. 14.

That’s when local and regional leaders discussed the current state of Washington’s drought situation and information those entities can share to help each other navigate the dry times.

The sign’s arrow will be adjusted according to the Dungeness River stream flow as read from the U.S. Geologic Survey’s flow gauge at River Mile 11.2, Soule said.

The values for each category were based in part on input from water managers in the Dungeness watershed.

An immediate action residents can take is to avoid watering non-essential plants outdoors, particularly lawns, Soule said.

Long-term actions to help ease drought conditions include using drought-tolerant plants, cultivating healthy soil and building a rain garden that controls standing water and runoff, she said.

For more information, email WaterStoryClallam@gmail.com.

________

Michael Dashiell is the editor of the Sequim Gazette of the Olympic Peninsula News Group, which also is composed of other Sound Publishing newspapers Peninsula Daily News and Forks Forum. Reach him at michael.dashiell@sequimgazette.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading