Children crowd around as Laura Sehn, project manager with Play By Design, unveils a conceptual drawing of the “Generation II” Dream Playground. The new playground will feature a treehouse, a castle and a zipline. (Jesse Major/Peninsula Daily News)

Children crowd around as Laura Sehn, project manager with Play By Design, unveils a conceptual drawing of the “Generation II” Dream Playground. The new playground will feature a treehouse, a castle and a zipline. (Jesse Major/Peninsula Daily News)

New Dream Playground to be built on youngsters’ ideas

Plan for Port Angeles park unveiled

PORT ANGELES — The children of Port Angeles have spoken and the designer of the next generation of the Dream Playground has listened.

Children gathered around Play By Design project manager Laura Sehn on Wednesday evening as she unveiled her drawing of what the Dream Playground — originally built in 2002 — will look like after it is rehabilitated next summer.

There were “oohs” and “aahs” as Sehn told the youngsters that the new version will sport a tree house, a castle and a zipline at the iconic Port Angeles park at Race and Third streets.

“When you look straight ahead there will be a grand entrance that welcomes you into the playground,” she said. “You’re going to go through the entrance and the first thing you’re going to see is a big giant tree house. It’s not just any tree house; it looks like a real tree.”

That tree house will have a “secret” vertical tunnel that kids can climb up and down through “just like a chipmunk.”

When they go through another net tunnel they will find themselves in a castle. From there they can see the gymnastics bars, a tightrope and a zipline.

There will be spinning toys — such as a merry-go-round that is wheelchair accessible — bouncy toys and things to climb on. The Coast Guard boat will move to a pretend fish pond and a garden is planned.

“One thing I’ve heard over and over and over again is line of sight,” Sehn said. “A lot of times playgrounds back in the day were built with lots of nooks and crannies and hiding places, which can be fun for kids, but not so much for parents.”

At the center of the park will be the area for the parents, who will be able to see their children no matter where they are in the park.

A conceptrual drawing of the “Generation II” Dream Playground. (Play By Design)

A conceptrual drawing of the “Generation II” Dream Playground. (Play By Design)

Parents applauded as Sehn told them that the new park will not have wood chips. Instead it will have pour-in-place rubber.

“They won’t be digging in it,” she said. “It’s not going to come home in your kids’ shoes.”

The rubber surface will be similar to the new playgrounds at Shane Park and Quinn Redlin Kintner Memorial Park.

Sehn said she developed the design by working with youngsters across the Port Angeles School District. Many of their drawings, which inspired Sehn’s drawing, were hanging up as Sehn presented.

“We take everything your kids say to heart and really think about what your playground is going to look like,” Sehn said. “You’re not going to see a playground like yours anywhere else in the whole world.”

Sehn outlined a two-week construction timeline that will take place next summer.

Steve Methner, president of the Dream Playground Foundation, said he was impressed with how well Sehn incorporated the many ideas that children had for the park.

“I am absolutely delighted by how many of the kids’ ideas she was able to actually put in there,” Methner said.

There were many ideas that Methner said he couldn’t imagine could actually be included in the design.

“I’m sure this will evolve over the next year, but it really is driven by our own kids, which is exciting.”

Methner said the plan now is to fundraise for the next year in anticipation of building in August 2020.

He said the playground will cost about $400,000 to $450,000 to build and that the foundation has about $120,000 in hand now.

He said the foundation plans to ask some donors to help out and will apply for grants.

The foundation plans to dedicate the park Sept. 11, 2020.

For more information about the project or to get involved, visit www.padreamplayground.org.

________

Reporter Jesse Major can be reached at 360-452-2345, ext. 56250, or at jmajor@peninsuladailynews.com.

Braden Gray, 5, realizes the stack of blocks he had been playing with are about to fall during the reveal of the “Generation II” Dream Playground. (Jesse Major/Peninsula Daily News)

Braden Gray, 5, realizes the stack of blocks he had been playing with are about to fall during the reveal of the “Generation II” Dream Playground. (Jesse Major/Peninsula Daily News)

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading