Navy water purification system headed soon to Neah Bay from California

NEAH BAY — A system to turn salt water into drinking water is heading toward the Makah reservation on Friday.

The 15,000-pound system will be carried by truck from a Navy facility in Port Hueneme, Calif., and is expected to arrive as early as Monday, said Patty Manuel, the tribe’s assistant general manager.

Indian Health Services and the Army are working together in arranging the transport, said Mathew Martinson, a civil engineer with Indian Health Service’s Portland area office.

The system is one of two designed by the U.S. Office of Naval Research for response to natural and manmade disasters, Martinson said.

The system, which is powered by diesel generators, can purify up to 100,000 gallons of salt water per day, and 200,000 gallons of fresh water.

The Makah tribe will use the system to recover from a water shortage created by a lack of rain and high visitor traffic over the summer, Tribal Chairman Ben Johnson said.

Water restrictions

The Tribal Council declared a state of emergency and put strict water restrictions in place on Aug. 29 after its public works department notified it that less than two days worth of drinking water — about 625,000 gallons — were left in the tribe’s treatment facility.

In addition, the tribe’s two main water sources, the Waatch River and Educkett Reservoir, were reported to be at critically low levels.

The strict water restrictions on the 1,800 residents of Neah Bay have kept the treatment plant’s water level at about 625,000 gallons, said Patty Manuel, the tribe’s assistant general manager.

“We’ve gained a little bit more, but we’re still not out of the woods yet,” Manuel said.

Residents of Neah Bay use about 350,000 gallons of water a day, which has been reduced to 200,000 gallons since the water restrictions were put into place, said Julie Johnson, the tribe’s director of intergovernmental relations.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading