Maier Hall completion to be feted at Peninsula College

PORT ANGELES — The new Maier Hall at Peninsula College is almost ready to house fall classes when the quarter begins Monday, Sept. 26 — and the public is invited to take a look at it during a grand opening three days before classes begin.

“It’s almost ready to go, said Phyllis van Holland, public information director, last week.

Still in the works were computer connections and other finishing touches, she said.

Two special events Friday, Sept. 23, will mark the completion of the $36 million building.

The day’s festivities will begin at 2 p.m. with a ribbon-cutting and a program that will include speeches by Peninsula College President Tom Keegan, state Reps. Kevin Van De Wege and Steve Tharinger — who represent the 24th District, which covers Clallam and Jefferson counties and part of Grays Harbor County — and Schuyler Hoss, Gov. Chris Gregoire’s Southwest Washington regional representative.

After the speeches, visitors can take self-guided tours of the new facility that will house art, math, liberal arts and music programs, as well as a 131-seat performance hall.

First concert

The performance hall on the ground floor of Maier Hall will be busy that night when the inaugural concert there begins at 7 p.m.

Performers will include the Peninsula College Jazz Ensemble and classical chamber musicians from the North Olympic Peninsula, including Fred Thompson on cello, Kristin Brye on piano and David Jones on clarinet and piano, as well as vocalist Robbin Eaves.

Once it is refurbished, a totem pole that once sat in front of the buildings that it replaces will be returned, Keegan said.

Totem pole

The totem pole was carved by Peninsula College Trustee Harris “Brick” Johnson, and his family is having it updated.

A pole-raising ceremony separate from the grand opening will be scheduled after Maier Hall is open for classes, Keegan said.

Here are a few of the highlights of the new 62,950-square-foot Maier Hall:

■ A learning center, featuring writing, math, computer and foreign language labs.

■ Music classrooms, labs and practice rooms.

■ A ground-floor ceramics lab and third-floor art studios.

■ Modern classrooms for courses in English, math, the social sciences and humanities.

■ A new learning environment for Basic Skills students.

■ Faculty offices.

Maier Hall also has a number of sustainable features that include geothermal energy, daylight harvesting, natural ventilation, wetland restoration and a moss roof.

Moss roof

The moss roof on the second-floor overhang will serve as a filter for rainwater running off the building and into the wetlands, David Wegener, construction project manager for Peninsula College, has said.

The Science and Technology Building also has a “green” roof, but it includes 16 inches of dirt, whereas the moss roof on Maier Hall is light and can easily be rolled off and back on should a leak spring.

The moss, developed by Roy Hellwig of Sequim, the architect for the campus’ Longhouse, is a new process for such a large building.

Maier Hall — named for E. John Maier, the founding president of Peninsula College, who served from 1961 to 1975 — replaces Buildings F, G, H and I, which were built during Maier’s presidency in the 1960s.

The construction team of Howard S. Wright is from the same company that built the Space Needle in 1962.

Architect Walter Schacht of Schacht Aslani Architects in Seattle did the design.

For more information about the grand opening, visit the college’s website at www.pencol.edu.

More in News

Two dead after tree falls in Olympic National Forest

Two women died after a tree fell in Olympic National… Continue reading

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading