Lowering of Lake Mills starts today

OLYMPIC NATIONAL PARK — Lake Mills behind Glines Canyon Dam will be lowered 18 feet starting today as part of the preparation for the removal of the dam and another on the Elwha River.

Bureau of Reclamation dam managers will lower the water level by about 1 ½ feet every day until it is about 18 feet lower than normal, Olympic National Park spokeswoman Barb Maynes said.

The water will be released by opening the dam’s spill gates, Maynes said.

The drawdown is expected to accelerate erosion along the new pilot channel dug in the delta at the top of the lake.

This drawdown is expected to last until Friday, Oct. 29. Fall and winter rains are expected to refill the reservoir.

“It is my understanding that the spill gates can be used until about this [18-foot] level,” Maynes said.

“We won’t lower it to such a level that the river will stop; we will only lower it to the point that the river can still flow.”

Lowering the lake will expose sediment, allowing the excavator operator to scoop a pilot channel through the blockage in preparation for the tear-down of the Glines Canyon and Elwha dams that will begin in September 2011.

The massive project is expected to be completed in March 2014.

The channel was dug in late September and early October.

The dam removals will open up 70 miles of the river and its tributaries.

As the water levels are drawn down, the boat ramp will not be usable, Maynes said.

“Once dam removal begins, the river will carry large amounts of sediment downstream where it will restore fish habitat, shellfish beds and beaches along the Strait of Juan de Fuca,” Karen Gustin, Olympic National Park superintendent, said in a written statement.

“Lowering the reservoir levels will continue to give the river the head start it needs to erode the sediment.”

More in News

Two dead after tree falls in Olympic National Forest

Two women died after a tree fell in Olympic National… Continue reading

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading