State Department of Transportation crews inspect a sunken section of state Highway 112. (Photo courtesy of WSDOT)

State Department of Transportation crews inspect a sunken section of state Highway 112. (Photo courtesy of WSDOT)

Landslide closes 7.5-mile portion of Highway 112

Geologists examine area between Joyce, Clallam Bay

PYSHT — A 7.5-mile section of state Highway 112 is closed until further notice east of Pysht after heavy rains caused a slow-moving landslide, the state Department of Transportation said.

One section of the roadway has settled more than 18 inches across both lanes of travel and two other sections near milepost 31.8 have settled below the roadway, DOT spokesman Doug Adamson said Wednesday.

The highway is closed to all traffic between mileposts 31.4 and 38.9.

The agency “is in the process of identifying what work is needed to re-open the highway,” agency officials said Wednesday.

Until repairs can be made, drivers will need to follow U.S. Highway 101 and state Highway 113.

DOT geologists assessed the remote section of the highway between Joyce and Clallam Bay this week.

The area has long been prone to landslides and flooding.

A hill behind state Highway 112 between Joyce and Clallam Bay washed out during recent heavy rainfall. (Photo courtesy of WSDOT)

A hill behind state Highway 112 between Joyce and Clallam Bay washed out during recent heavy rainfall. (Photo courtesy of WSDOT)

“Our engineering geologists examined the three locations and found the hillside is still moving in at least one place around the highway,” Adamson said in a DOT blog post Wednesday.

“In one section, the roadway drops 22 inches where a 100-foot-long settlement stretches across the highway.”

Crews could hear material moving in the forest above the roadway on Tuesday, Adamson said.

“We’ve yet to see the settlement stop, and geologists observed a crack in the hillside over the roadway,” Adamson said.

Engineering geologists will return to the slide area next week.

“Once they give us the all-clear, our crews can safely clear and repair the roadway,” Adamson said.

“We understand the importance of this highway for everyone who uses it. However, Mother Nature is setting the tempo at this time. We’ll continue to monitor the situation and set a game plan for repairs.”

The winding section of Highway 112 between mileposts 31 and 39 was deemed not viable for high-volume traffic when DOT considered options for replacing the U.S. Highway 101 bridge over the Elwha River in 2016.

DOT will provide email updates and use the WSDOT blog to report on this closure. Follow WSDOT on Twitter for updates.

More in News

Two dead after tree falls in Olympic National Forest

Two women died after a tree fell in Olympic National… Continue reading

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading