In wake of Port Townsend water main break, city manager sees need to improve notification system

PORT TOWNSEND — Now that a broken water main has been fixed and city water has been declared safe to drink — after a 27-hour incident put thousands of residents, including restaurants, on a boil-water advisory — were any lessons learned?

Port Townsend City Manager David Timmons said the city should look at quicker ways to notify residents of similar situations in the future.

“What this situation really highlights is the need to look at an emergency notification system,” Timmons said.

“And not just a city system, but one that can be used for the entire county.”

He is going to look into systems that could call and e-mail residents in the event of an emergency.

Health officials phoned restaurants, schools, the hospital and senior citizen centers individually on Monday.

The news then spread rapidly by cell phone — but many residents learned the specifics of why brown water was spilling from their taps from news alerts posted on the Peninsula Daily News’ Web site and at other local Internet sites and through Twitter and Facebook postings.

A rupture in a 12-inch main near Water and Monroe streets in the city’s tourist district around 12:30 p.m. Monday caused a flush of approximately 150,000 gallons of water from the system.

Brown water poured from taps because the break disrupted water pressure, stirring rust sediment inside the pipes.

Some 6,000 residents were advised by the state Department of Health to boil their water or drink bottled water.

Restaurants and other food service operations were asked to shut down.

Supermarkets reported brisk sales of bottled water.

Multiple test samples sent to the state came back clean at 3 p.m. Tuesday, and the state lifted its “boil before consuming” advisory and allowed businesses to reopen.

To avoid damaging household plumbing, officials said anyone with brown water should run their tap for at least 15 minutes until the water cleared up.

Timmons said a latent fracture along a pipe ruptured when a compacting machine working on construction in the downtown area drove over the ground some four feet above the buried pipe.

Timmons said the pipes in the area were of many different ages, and it was unknown if the pipe ruptured due to dilapidation — or decay — or if it was a problem created in the initial construction of the pipe.

The pipe was repaired Monday night.

It was not known Tuesday how much the repair cost.

Not at risk

Timmons said that residents were not at risk due to the break.

“Nothing new got into the system when the pipe broke,” Timmons said.

“All the sediment that is kicking around in there was already there, it just got stirred up.”

Timmons said sediment included small particles of rust, sand and other minerals that exist within the water system.

Bottled water

Stores reported brisk sales of bottled water Monday and Tuesday as people stocked up.

Deb Shortess, manager at Port Townsend Food Co-Op, said the store had one bottle of water left on the shelf Tuesday afternoon.

“If you are that last person coming in, then you are in luck,” Shortess said.

“Beyond that, we have nothing left and will be out until our next delivery Wednesday morning.”

Shortess said the Co-Op had reports from other stores in the area that they, too, were selling out of water.

The deli at the Co-Op shut down Monday as a part of the food services operation ban imposed by the state.

“We could have started up again at noon [Tuesday] if we boiled water to cook, but we made the decision to just wait until Wednesday and start up again then,” she said.

Gary and Nancy Tocatlian, owners of T’s Restaurant, said they shut down operations Monday night after receiving a call from the city.

“But we didn’t get a call until 5:45 p.m.,” Nancy Tocatlian said.

“We served a full lunch crowd, and we were slammed.”

Lost money

The Tocatlians estimate that by missing out on a dinner service, they lost about $3,000 in business.

“It’s hard to shut down for dinner during the holidays,” Nancy Tocatlian said.

“People are with large groups and a lot of people choose to go out to dinner around this time of the year.”

Gary Tocatlian also said now they would have to clear out all their water as a precaution for their patrons.

“It’s going to cost money to melt all the ice we have, take time to freeze new ice, clear and replace the filters and flush the systems,” he said.

“But we will do it, just to be safe.”

________

Reporter Erik Hidle can be reached at 360-385-2335 or at erik.hidle@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading