Hoko River project seeks salmon recovery and habitat restoration

Salmon coaltion takes lead in collaboration with Makah, Lower Elwha tribes

PORT ANGELES — The North Olympic Salmon Coalition is seeking to restore a half-mile of the Hoko River channel and floodplain for salmon recovery and wildlife habitat restoration and to prevent erosion of the Hoko-Ozette Road.

“It sounds like this is an area both where work needs to be done and where there’s opportunity because of land ownership and interest of local partners,” Clallam County Commissioner Mark Ozias said at the commissioners’ April 8 meeting prior to the commissioners’ approval of a letter of support for the project.

The goal is to have 100 percent design and permitting finished by December 2026. No construction schedule has been proposed. The estimated design cost is $322,885.

Kevin Long, senior project manager for the North Olympic Salmon Coalition, said stacking woody debris in the river would slow down the river flow and allow water to go into the side channels and floodplain instead of all of it going into the main channel.

“So, success looks like slower water. The big thing you are going to notice is the water slowed down and spread out across the floodplain,” he said in response to a question from Ozias.

“That creates a whole bunch of habitat for fish and wildlife having that slower water. And as far as infrastructure goes, we stop the erosion that’s taking place at the Hoko-Ozette Road.”

Rebecca Mahan, Clallam County habitat biologist, said at the commissioners’ work session that the Makah Tribe unsuccessfully applied for funding last year, so the North Olympic Salmon Coalition took over as project lead in collaboration with the Makah, Lower Elwha Tribe and Washington State Parks, since the bulk of the restoration will occur on state parks property.

“That includes a portion of the Hoko-Ozette Road that is near Cowan’s Ranch, which tends to get flooding and erosion and scarring,” Mahan said.

“So this project will help alleviate that and will help direct water away from the county road,” she said. “Part of this project is to excavate a channel across the river into a floodplain area.”

Mahan said the 77 proposed logjams will help keep the water from scouring away the riverbank and also will create pools that are deeper and colder for fish to rest and reside within. The Hoko has coho, Chinook, steelhead, cutthroat, chum and Pacific lamprey that would benefit from the project, she said.

Mahan said the permits are ready and the project is 60 percent designed. The coalition is seeking funding to finish the project design, she said.

________

Reporter Brian Gawley can be reached by email at brian.gawley@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading