High times for log exports to Asia, but they’re expected to drop in 2012

PORT ANGELES — After hitting levels not seen in nearly two decades, log exports from the North Olympic Peninsula are expected to take a drop next year.

A growing appetite for logs in China made exports skyrocket this year, from 20.25 million board feet in 2010 — which itself reached an 11-year high — to a projected height of 80 million board feet by year’s end.

The evidence can be seen along the Port Angeles waterfront, where logs are continually stacked high while waiting to be loaded into containers or onto log ships.

But tightening credit restrictions in China combined with a backlog of timber are expected to create a drop in demand, industry analysts and log exporters said.

“There are too much logs over in China now,” said Hakan Ekstrom, president of Wood Resources International LLC.

“They haven’t used as many logs as they have expected, so they have huge inventories of logs in the ports over in China.”

The Port of Port Angeles is projecting exports to drop to 65 million board feet in 2012.

Mike Nimmo, port marine facilities marketing manager, said in an email that he expects exports to drop the first half of the year but begin slowly increasing again afterward.

Paul Stutesman, log marketing vice president for Merrill & Ring, said he expects China to continue to be a customer for Peninsula logs in the long run, despite the projected decrease.

“I think long-term, we see China as a valuable market for fiber,” he said.

Stutesman said the Chinese market has been a real “shot in the arm” for the timber company.

“We’re at the highest [harvest] levels since 2007, that’s for sure,” he said.

The export market has also been good for the Port Angeles Hardwood mill, according to mill President Lindsay Crawford.

Crawford said lumber exports now make up about 40 percent of production at the mill, compared with 15 percent to 20 percent before the recession, and have helped make up for the drop in domestic demand that followed the collapse of the housing market.

“The only place there are strong business conditions in the world is in Asia,” he said.

But the export of logs also presents a downside for lumber manufacturers.

Crawford said the cost of logs is up about 20 percent this year, largely due to foreign sales.

The mill exports lumber through the ports of Tacoma and Seattle, he said.

Logs ready to be exported can be seen stacked in two areas along the Port Angeles waterfront: at the port’s log yard and at Peninsula Plywood.

PenPly, which is now closed, has operated a debarking machine to prepare logs for export.

The company sold the machine last year to Dkoram, the U.S. subsidiary of a South Korean log importer, but continued to operate it, said Grant Munro, a PenPly owner.

Munro also owns Munro LLC, which acts as a broker for the export of logs, including those debarked at PenPly.

He said another operator should be found shortly and he doesn’t expect PenPly’s closure to affect exports.

________

Reporter Tom Callis can be reached at 360-417-3532 or at tom.callis@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading