One of the climate change vulnerability study maps at http://tinyurl.com/PDN-Jamestown-study . (Click on map to enlarge)

One of the climate change vulnerability study maps at http://tinyurl.com/PDN-Jamestown-study . (Click on map to enlarge)

GUEST COLUMN on climate change: Plan now to move people and infrastructure, including roads, out of harm’s way (by Jamestown S’Klallam CEO Ron Allen)

  • By W. Ron Allen
  • Sunday, January 5, 2014 12:01am
  • News

By W. Ron Allen

EDITOR’S NOTE: Ron Allen, the author of this guest column, is tribal Chairman-CEO of the Jamestown S’Klallam tribe.

FOR MORE THAN 10,000 years, the S’Klallam people have lived and prospered on the land and water of what is now known as the Olympic Peninsula in Washington state.

Over time, the S’Klallam people have successfully navigated a variety of changes while maintaining a strong connection to the resources, rich lands and waters of our region.

Like the rest of our community, the S’Klallam people are still dependent upon the land and water for our survival.

And like many, we have been considering how to strengthen resilience to extreme weather developments and prepare for other impacts of climate change.

In my opinion, to ensure continued economic growth, promote long-term community vitality and protect sensitive resources and assets, it is essential that we incorporate climate change into our planning efforts and operations.

The Jamestown S’Klallam tribe, with the help of Adaptation International, performed a climate change vulnerability study.

Through this project, we identified key areas of concern and possible adaptation strategies.

Sea-level rise is one of many important concerns.

We know that sea levels have been rising and will continue to rise in the future.

The tribal community can share anecdotes of the height of king tides over time, but it is important to focus on what is to come.

Relative sea-level rise (accounting for vertical, tectonic land movement) may increase by 2 feet before our grade-schoolers are 50 years old.

A relative rise of as much as 5 feet may occur by the end of this century.

Go to the shore and consider it: high tide plus 2 to 5 more feet of water.

And consider whether a storm event might damage infrastructure nearby.

The current shoreline cannot contain the projected level of seawater; it will spill over many shorelines onto the lowest land.

As a community, we’ll need to begin thinking about moving people and infrastructure, including roads, out of harm’s way.

We must begin the process of discouraging people from building in areas that will be threatened in the future.

Much of our tribal commerce and development will depend on the capability of U.S. Highway 101 to function efficiently as our region’s primary transportation corridor.

Our hunting, fishing and gathering is dependent upon healthy and sustainable resources — all of which may be affected by climate change impacts.

In our study (available online, with maps, at http://tinyurl.com/PDN-Jamestown-study) we discuss increasing temperatures, changing precipitation patterns, ocean acidification, forest habitat changes and human health.

The enormity of the issue feels overwhelming.

Yet, the S’Klallam culture promotes self-sufficiency and leadership, so we must do what we can.

Our greatest barrier to success is the failure to plan well.

Resiliency has personal meaning to me and is a trait frequently attributed to the Jamestown S’Klallam tribe.

It is interesting to see it so frequently used in climate-change-planning jargon.

Within the climate context, it means the capacity to anticipate, prepare for, respond to and recover from significant multihazard threats with minimum damage to social well-being, the economy and the environment.

Let’s anticipate and prepare for the changes.

The Jamestown S’Klallam tribe wants the shoreline communities of Clallam County to benefit from a planning horizon of at least 50 years, if not a hundred.

With that perspective in mind, one action we can take right now is to incorporate sea-level rise and storm surge predictions into the Shoreline Master Program currently underway.

I urge us to look ahead and be observant of trends and developments.

Let’s not move forward in denial.

Let’s plan and act responsibly.

________

This guest column appeared in the print edition of the Jan. 3-4, 2014, Peninsula Daily News.

More in News

U.S. Rep. Emily Randall.
US Rep. Randall speaks on House floor about insurance

Example of fictional family shows premium increase of more than 1,000 percent

Spending patterns led to pool audit

Office identifies $33K in unsupported payments

Comments oppose plan against Port Townsend zoning changes

Option would increase maximum limit on units per 40,000 square feet

x
Sequim program uses grant for utilities, rent

Community support through Peninsula Home Fund gives $10,000 to organization

Firefighters Tyler Gage and Tatiana Hyldahl check out the light connections on the 1956 fire truck that will travel the streets of Port Angeles during the 41st Operation Candy Cane beginning Monday. Santa and his helpers will pass out candy canes to those who donate food items or cash. The runs will begin at 5:30 p.m. and include the following areas: Monday, west of I street and M street; Tuesday, I and L streets to C street; Wednesday, C Street to Lincoln Street; Thursday, Chase Street to Chambers Street; Friday, Jones Street to Golf Course Road; Dec. 13, above Lauridsen Boulevard. It will be stationary from 5:30 p.m. to 7 p.m. on Dec. 14 at the Port Angeles Grocery Outlet and during the same time on Dec. 15 at Lower Elwha Food and Fuel. (Dave Logan/for Peninsula Daily News)
Operation Candy Cane

Firefighters Tyler Gage and Tatiana Hyldahl check out the light connections on… Continue reading

Online survey launched for Sequim parks access

The city of Sequim has launched an online survey to… Continue reading

Crews work to remove metal siding on the north side of Field Arts & Events Hall on Thursday in Port Angeles. The siding is being removed so it can be replaced. (Dave Logan/for Peninsula Daily News)
Siding to be replaced

Crews work to remove metal siding on the north side of Field… Continue reading

Tsunami study provides advice

Results to be discussed on Jan. 20 at Field Hall

Chef Arran Stark speaks with attendees as they eat ratatouille — mixed roasted vegetables and roasted delicata squash — that he prepared in his cooking with vegetables class. (Elijah Sussman/Peninsula Daily News)
Nonprofit school is cooking at fairgrounds

Remaining lectures to cover how to prepare salmon and chicken

Port Townsend Main Street Program volunteers, from left, Amy Jordan, Gillian Amas and Sue Authur, and Main Street employees, Sasha Landes, on the ladder, and marketing director Eryn Smith, spend a rainy morning decorating the community Christmas tree at the Haller Fountain on Wednesday. The tree will be lit at 4 p.m. Saturday following Santa’s arrival by the Kiwanis choo choo train. (Steve Mullensky/for Peninsula Daily News)
Decoration preparation

Port Townsend Main Street Program volunteers, from left, Amy Jordan, Gillian Amas… Continue reading

Port Angeles approves balanced $200M budget

City investing in savings for capital projects