Grant covers installation of electric chargers

Port Angeles funding to cover 50 chargers

PORT ANGELES — The federal government awarded $2 million to the City of Port Angeles for the installation of 50 electric vehicle charges in an effort to expand infrastructure and support tourism.

Another $14 million grant will go to Energy Northwest — a Washington-based public power utility — to install 40 fast and 12 Level 2 EV chargers across Western Washington and Oregon, including Forks, Sequim, Quilcene, Port Ludlow, Shelton, Raymond, Ilwaco, Kamilche, Longview and Kalaloch.

U.S. Rep. Derek Kilmer’s, D-Gig Harbor, office announced last week that Port Angeles was granted $2,103,611 for the charges through a program funded by the U.S. Department of Transportation.

“This is a big deal,” Kilmer said in a press release. “Let’s talk about what this means. It means our state’s most rural areas — including places like Port Angeles near the Olympic National Park — will have new charging infrastructure to support economic activity, enabling more tourism and more business.”

The grant will fund the installation of 50 fast and type II electric vehicle (EV) chargers near U.S. Highway 101, the release said.

Jessica Straits, communications and records management coordinator with the city, said in an email the city would install seven chargers for the city’s police fleet and the remaining 43 throughout the city, centered around Highway 101.

Locations for the chargers are:

• Port Angeles Corporation Yard, located close to the Tumwater Truck Route and Highway 101.

• Port Angeles downtown parking lot, a block from the Blackball Ferry Terminal.

• Port Angeles Senior Center, 328 E. Seventh St.

• Erickson Park/Civic Field, 302 S. Race St.

• Various City parking areas, about two to three blocks from Highway 101.

• Port Angeles Police Station, 321 E. Fifth St.

• Port Angeles Fire Department, 102 E. Fifth St.

Charging capabilities for alternative transportation options such as electric bicycles also will be explored at several locations.

The grant will provide the lion’s share of the money for the project, which is estimated to cost a total of $2,629,514. The city will provide the remainder, according to officials.

“We’ve witnessed a growing demand for EV charging infrastructure, particularly amongst our visitors,” Straits said. “This project ensures our community can continue to welcome visitors and support the changing needs of both residents and visitors alike.”

Additional information timing of the grant is still forthcoming, Straits said.

“This investment ensures our city is ready for the future, supporting the sustainability and climate resiliency goals of our community, while also addressing the evolving needs of our residents and visitors,” said Port Angeles Mayor Kate Dexter.

“As the demand for EV chargers grows, we are accommodating the needs of our residents and ensuring that visitors with electric vehicles can seamlessly explore all our community has to offer.”

The grant is provided through DOT’s Charging and Fueling Infrastructure Discretionary Grant Program, which will allocate $700 million nationwide in 2024.

According to DOT, Level 2 EV chargers, offer higher-rate AC charging through 240-volt or 208-volt electrical service and is common for home, workplace, and public charging. Level 2 chargers can charge a battery electric vehicle to 80 percent from empty in four to 10 hours and a plug-in hybrid electric vehicle in one to two hours.

The funding is provided by the 2021 Bipartisan Infrastructure Law which authorized $1.2 trillion for transportation and infrastructure spending. The law provided $2.5 billion over five years for DOT’s charging and infrastructure grants.

________

Reporter Peter Segall can be reached at peter.segall@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading