Floating home goes up at Port Townsend shipyard; destination is Lake Union in Seattle [***GALLERY***]

PORT TOWNSEND — There’s one thing that catches the eye when you look over this new home going up at the Port of Port Townsend shipyard — it sits atop a massive float.

“We’ll launch it just like a boat,” said Bob Little, president of Port Townsend’s Little & Little Construction, a crew of about 10 that is building its first “floating home” at the site adjacent to Larry Scott Memorial Trail and the shore leading to Port Townsend Bay.

“In essence, we’re just building a home on a slab,” Little said. “It’s been great fun, and what a fun learning experience.”

Little, whose family has built traditional homes in Jefferson County since 1979, said the floating home is being constructed for a family that outgrew a boathouse on Lake Union in Seattle.

He met the family members when his crew built them, in recent years, a Port Townsend home where they live on weekends. The family approached him about building the floating home.

A Port of Port Townsend official said he believed it is the most ambitious such project ever built at the shipyard.

“They’ve built quite a few house boats there, but nothing this big,” said Jim Pivarnik, Port of Port Townsend deputy director.

Like other homes inside

The well-insulated luxury home is much like others inside, with a cinder block fireplace in the spacious living room that will have a wall of folding glass doors that can open out to a deck on warm days.

It has bedrooms and baths and plenty of view windows, now looking out over the Port Townsend Bay from the shipyard.

Upstairs is a family room, master bedroom, office space and a master bath.

It will have radiant heating in its heavily reinforced floors.

The exterior walls are specially designed with cedar planks atop hollow panels that allow for maximum drainage when the wind whips up rain or Lake Union’s waters.

Biggest difference

The main difference between this home and most others is it has a 6-foot-high concrete base filled with 500-pound Styrofoam blocks upon which the structure of nearly 2,000 square feet will float.

Little figures the two-story building will weigh about 600,000 pounds when completed.

The final challenge will be moving it into the Lake Union floating home community, which Little said requires moving existing homes to make room for the new home’s placement on the dock, all at the new owner’s expense.

While he declined to say what construction would cost, Little said the home was comparable in price to a traditional home of its size on land because it required no land acquisition or grading expense.

Much of the weight is in the float, a 30-by-40-foot slab of concrete filled with 12 Styrofoam blocks, each weighing about 500 pounds.

The blocks are encased in about 8 inches of concrete — about 90 yards had to be poured — which took about three months to complete beginning in June, before the home’s construction could even begin.

It was the most time-consuming part of the project, Little said.

Launch in January

Once launched during a high tide during the first week of January, Little said the home will be towed north to the port’s Boat Haven marina nearby.

Port officials said it would be moored at the marina’s linear dock until the weather clears, allowing for a safe tow to Seattle.

The home was designed by Seattle architect Barry Burgess.

Like other floating homes, the building is pre-plumbed and wired for hookup at the dock.

Jeff Monroe, owner of Monroe House Moving in Carlsborg, originally based out of Quilcene, said he will team up with D.B. Davis House Moving of Everett to move the floating home into the water.

“It will be like the Evviva,” Monroe said, referring to the launch of the 161-foot yacht built in 1993 before the Port of Port Townsend acquired a 300-ton marine lift to serve the shipyard.

Monroe remembered how his family’s company endured much stress to move the yacht on thick plywood and dollies.

The floating-home construction site was located close to the water for that reason, port officials said.

Monroe said the home movers were still in the planning stages, but he was confident they could launch the home as long as it had 6 feet of water on which to float at high tide.

The launch will require opening a fence between the shipyard and the public trail, and installing barge ramps from the footpath to the beach so as not to disturb the beachhead.

________

Sequim-Dungeness Valley Editor Jeff Chew can be reached at 360-681-2391 or at jeff.chew@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading