‘Exceptional’ sport fishing yacht launches in Port Townsend on Saturday

PORT TOWNSEND — Sometime around 2 p.m. on Saturday the Cielo Mare, a 127-foot sport fishing yacht that has taken over three years to build, will take its first dip into the water — that is if weather permits.

“If there is too much of a breeze, we won’t be able to do it,” said Paul Zeusche, chief executive officer of Townsend Bay Marine.

“It’s in one big bay, and those doors won’t open if the wind is blowing too much, but yes, weather permitting, we will put it in the water on Saturday.”

The vessel, said to be the third largest sport fishing vessel in the world, is also the largest constructed by Port Townsend Bay Marine.

With measurements of 127 feet from bow to stern, and an out-of-water height of 45 feet to the top of the mast, the giant yacht is a mechanical marvel.

“It’s not just one thing that makes this vessel exceptional,” Zeusche said. “It’s a very complex boat and it’s been a long time coming.

Fishing vessel and yacht

“This boat is just impressive with the way it is a fishing vessel and a yacht,” Zeusche said.

“It can stay out in the ocean for extended periods as a fishing vessel and still have all of the comforts of home.”

The boat announces a home harbor of Jaluit, Marshall Islands on its stern, but Port Townsend Bay Marine is keeping all other specifics quiet.

The price of the boat and the owners are both unknown.

“It costs a lot and the owners are American,” Zeusche said. “Other than that, no one will ever know.”

Spacious interior

The boat’s interior alone is more impressive than most homes, with a large main room, full kitchen and dining room, master bedroom, three guest quarters and an extensive crew quarters that can house four individuals.

The entire boat is lined with custom woodwork from the walls to the floors, marble counters and tabletops and pictures of dolphins etched into the glass shower doors.

Technologically speaking, the vessel boasts 10 television screens, multiple media servers with 17 terabytes of storage for movies and music, streaming data capability throughout the ship, ipod docks in each room, a full public address system and security cameras, all strung together with over 12 miles of cable.

“The technology put into this is very impressive,” said Dan Owen, an electrician with Port Townsend Bay Marine.

“You can store a ton of movies on the servers and just scroll right through them in any room with no need for disks. It’s amazing what has gone in here.”

Outside on the deck, the Ceilo Mare has more than 50 holding locations for sea fishing poles, multiple decks, an outdoor barbecue, an outdoor dining area and three locations to pilot the boat besides the captain house.

“We started on the boat in May of 2006,” Zeusche said.

“It took some extra time than usual, because it’s a very spacious luxury vessel.

“We started from scratch in here and, over the years, used over 45 different contractors to help with some parts of the work, most local.

Zeusche said the last time a boat this size came out of the marina was in 1993 when Admiral Marine launched the 162-foot yacht Evviva.

If the weather cooperates, the Cielo Mare will exit Port Townsend Bay Marine’s hanger at about 8 a.m. via the large haul-out, and be on display until 2 p.m. while crews finish final details.

________

Reporter Erik Hidle can be reached at 360-385-2335 or at erik.hidle@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading