Elwha River turns red for pre-dam removal test

PORT ANGELES — Part of the Lower Elwha glowed red Tuesday during one of the tests needed to prepare for the removal of two dams up river.

The color, called “blood red” by some callers to the Peninsula Daily News who spotted it in the river at the end of Lower Elwha Road, dissipated later in the afternoon after U.S. Geological Survey scientists put a nontoxic, fluorescent dye, Rhodamine WT, upstream.

Scientists are tracking the dye, which can be detected by equipment at low concentrations, as it flows downstream, said John Clemens, spokesman for the USGS Washington Water Science Center in Tacoma.

The dye will show scientists how long water takes to travel from one point to another in the river, and illustrate the complexities of the river’s structure because channels, rocks and woody debris slow the movement of the dye, Clemens said.

“It will provide a ‘before’ snapshot of what the river is like now,” he said.

“After the removal of the dams, we will be able to tell what has changed.”

The 108-foot Elwha Dam and the 210-foot Glines Canyon Dam, which were built without fish ladders, are scheduled for removal in a $308 million project that will begin in 2011.

The dam removal project, the largest of its kind in the nation, is intended to restore the river to its natural state and enhance salmon habitat.

Dye harmless

Often used in hydrologic studies, Rhodamine WT is harmless, USGS scientists said.

“You might see a reddish tint to the water during the week of September 28th, but it’s nothing to worry about,” said Rich Sheibley, USGS hydrologist and leader of the dye study, in a prepared statement.

“Scientific use of this dye is very common, and has been shown to be harmless to aquatic life and human health.”

The experiment will provide a baseline condition for comparisons to additional dye releases after the dams are removed in 2011.

“It’s important to document and define all the conditions of the river prior to the removal of the dams,” Clemens said.

The picture of the movement of the water in the river provided by the red dye test will help guide the process of the dam removal, he explained.

“It’s good to have a ‘before’ and ‘after’ [picture], so you can see what happened here and why,” he said.

The dye test is one of many needed before the dams are taken down.

On such tests was to draw down the pools behind the dams to saee how sediment will behave when the dams are removed, Clemens said.

“There are all kinds of things to get done before any dam removal,” he added.

Color fades quickly

He said that the color of the dye is a bright red, but that it fades relatively quckly.

“If you are in immediate area where the dye has been added to the river, it will be very notable. But as it moves downstream, it will become fainter.”

The study is part of ongoing work by the USGS, the state Department of Ecology, the Lower Elwha Klallam tribe, the National Park Service, and the Bureau of Reclamation to document conditions in the Elwha River prior to removal of the two dams.

——

Managing Editor/News Leah Leach can be reached at 360-417-3531 or at leah.leach@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading