Elwha Bridge closed for new railing

PORT ANGELES — The newly created span over the Elwha River west of Port Angeles was closed Thursday for up to three weeks to allow installation of improved guardrails.

Temporary wooden rails had been erected on the top level — the vehicle deck — of the 85-foot-tall, two-deck bridge on the Elwha River Road before it was opened in September.

“The bridge already has a guardrail for vehicles, but it is not very high,” said Ross Tyler, county engineer, Thursday.

“If you’re a bicyclist, it wouldn’t be very hard to go over if you were to crash.”

Those rails will be replaced with permanent steel railings that are 42 inches high.

“If all goes well, we hope we can get it open within two weeks, ” said Ross Tyler, Clallam County engineer, Thursday.

“Hopefully, it will be closed for this very short period, and then it can be reopened forever.”

The installation originally was planned in early February, but it was postponed to allow county officials to finalize a contract with Parsons RCI, which built the bridge, and to receive Federal Highway Administration approval of the steel rail.

The county had about $100,000 in prefabricated railing ready to be installed.

Most pedestrians cross the river canyon on the pedestrian path — part of the Olympic Discovery Trial — suspended by cables below car deck.

Some bicyclists, however, cross the scenic river valley on the upper deck, where the existing rail is thought to be too short for safe crossings on a bicycle.

“Once the new ones are installed, it will be very safe for both pedestrians and bicyclists,” Tyler said.

The $19.7 million, 589-foot span replaced the one-lane Warren-truss-type steel bridge that served the county from 1914 to 2007.

The bridge replacement project was kick-started by the catastrophic collapse of the Interstate 35W span in Minneapolis in 2007.

Clallam County closed the creaky one-lane Elwha River Bridge shortly after the Minnesota bridge collapse.

It was the only bridge closed in Washington state after the I-35W collapse.

Parsons RCI was awarded the contract to build the new bridge in July 2007.

__________

Reporter Paige Dickerson can be reached at 360-417-3535 or at paige.dickerson@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading