Ecology suspends Dungeness water rule-making through this year

SEQUIM — The state Department of Ecology has suspended rule-making in the Dungeness water through this year after reaching an agreement with Dungeness Valley irrigators and Clallam County on steps for protecting future water supply and stream flow restoration.

“The agreement is take the next 12 to 18 months, and locally we’ll come up with a proposal to [Ecology] to better meet the local needs,” said Ben Smith, Sequim Dungeness Valley Water Users Association president.

Local collaboration is the key to developing smart water management in the Dungeness, said Ecology Director Ted Sturdevant.

“This agreement is critically important to the future of the watershed, not only because it protects stream flows but also because of its emphasis on restoring stream flows in the Dungeness River and some streams,” he said.

“We recognize the benefits of hitting the pause button on rule-making and creating time and space for local leaders to seek out and negotiate new water supply projects that could benefit all partners.”

Competing demands for Dungeness River water supply varies greatly throughout the year and requires a collaborative effort to manage water, Ecology officials said.

The in-stream flow rule is a proposal that establishes minimum water levels for rivers and streams to protect fish and wildlife habitat.

While snowmelt on the North Olympic Peninsula is the main source of water in the Dungeness River in spring and early summer, flows drop rapidly. By late summer, streams and rivers are almost entirely fed by groundwater.

Farm irrigation and lawn watering are at their peaks in the summer and early fall, the same time spawning fish need water in the streams.

Species in the Dungeness River are threatened, including the Dungeness Chinook, summer chum and bull trout.

Insufficient stream flow is a critical factor.

Demands on the water supply are expected to increase because the area has one of the highest population growth rates in the state.

Five goals

The new agreement emerged during the drafting of a Dungeness water management rule and is built on five goals:

■ Preventing permanent reductions in Dungeness River flows or small streams because of new uses.

■ Supplying adequate and reliable water for new uses.

■ Ensuring sustainable agriculture in the Dungeness Valley.

■ Restoring stream flows in the main-stem Dungeness and where feasible, in small streams.

■ Putting in place an instream flow rule that protects instream resources and existing water rights within 18 months after the agreement is signed.

Steve Tharinger, a Clallam County commissioner and freshmen District 24 state representative said, “I think we all know the challenges we face in restoring flows in late summer, but we have the right people at the table who are committed to finding a solution.”

Jamestown S’Klallam Tribe has sent a letter of support to Ecology, pledging participation in efforts to improve water supply and restore stream flows in the watershed.

Jamestown S’Klallam Tribal Chairman Ron Allen said the tribe was honored to support the partnership that also restores and protects the tribe’s fisheries.

Marguerite Glover, a member of the county’s Water Working Group for the Dungeness Instream Flow Rule process, said she was concerned that there were a limited number of parties signing the agreement.

Public process

“I did not feel there was enough public process,” said Glover, a longtime Sequim-Dungeness Valley real estate agent. “I want everything in the open and out front.”

She wants Clallam County Public Utility District and the city of Port Angeles to also be involved in the process.

She agreed that Ecology is making sure everybody has water in the valley.

The instream flow rule proposes water banks, or exchanges of water, between irrigators and those wanting to buy water.

In a Feb. 15 letter to the Clallam County commissioners, Glover said, “Instead of proposing to limit the number of new wells, the gallons of water taken from new wells, and the use of the water from new wells (i.e., for inside use), why not just require deeper drilling, and limit the wells that are closest to the river?

“Not all wells impact the river. According to well drillers, some wells may even help the river and/or the streams.”

She calls for a rain gardens program.

She complained that meetings of the Water Resource Inventory Area 18 East In-Stream Flow Rule Executive Committee, which has now been deactivated, were not open or advertised to the public.

She said there are no minutes of meetings available.

________

Sequim-Dungeness Valley Editor Jeff Chew can be reached at 360-681-2391 or at jeff.chew@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading