Mary Helgeson and her 2-year-old daughter Kamrynn go down a slide at the Dream Playground in Port Angeles. (Jesse Major/Peninsula Daily News)

Mary Helgeson and her 2-year-old daughter Kamrynn go down a slide at the Dream Playground in Port Angeles. (Jesse Major/Peninsula Daily News)

Dream Playground ideas sought for makeover

Foundation issues survey for Port Angeles park

PORT ANGELES — The Dream Playground in Port Angeles is due for a makeover and the Dream Playground Foundation is asking the public for input.

The Dream Playground Foundation is asking people to fill out a 10-question survey as it looks to refurbish or replace the playground in 2020 or 2021.

The survey asks people what they like about the current playground, which is at Erickson Park on Race Street, what they don’t like and what they hope to see in the future.

“We’re really excited about getting moving on the next generation of something that is so vital to public life in a small town,” said Steve Methner, president of the Dream Playground Foundation.

“We want to bring it back to a place where people fall in love with it again and people feel it is a safe, comfortable and clean.”

The survey asks people about concerns and wishes for the park, but Methner said the foundation already has heard many ideas that will improve the next generation of the playground.

“Some parents have concerns about line of sight,” he said. “They want to see where all the kids are all the time and the structure as it is has lots of mazes and hiding holes. Sometimes that causes parents and grandparents not to be able to see all the kids.”

He said parents also have raised concerns about the ground cover at the Dream Playground. The mulch constantly needs to be replaced and maintained and some worry about what could be hiding in the wood chips.

Though there haven’t been any incidents at the Dream Playground, a boy was pricked by a dirty syringe that was close to the nearby parking lot.

“There are a number of options for that and we’re keeping our eyes open,” Methner said.

He said the foundation is considering rubber materials, such as tiles or a poured-in material, for the park.

“That seems to be what works well for kids and makes parents feel it is more clean and inviting,” he said. “We want it to continue to be the hub of play in Port Angeles.”

Methner said that moisture has compromised the wooden structures at the nearly 17-year-old park; while the wood above ground still looks good, the wood in the ground is weakened.

Exactly what the new park will look like and how much of the current structure will be incorporated is yet to be seen.

“We want to keep the same look and feel,” he said. “We’d like to get as much feedback as we can and we want it to be so darn awesome that kids just beg their parents to go play there again.”

Corey Delikat, director of the city Parks and Recreation Department and member of the Dream Playground Foundation, said the foundation has issued a request for proposals.

The foundation has asked Leathers and Associates — the firm that designed the current park — and Play by Design to submit bids on the project.

“The foundation did a really good job of researching the companies that do this type of playground,” Delikat said. “It’s much different than your average playground.”

Methner said that while the foundation is working to select a firm, the design will come after community input. He said foundation will be going to the schools to ask kids what they want to see at the playground, similar to when it was first constructed.

Delikat said the goal is to have the renovations completed in summer 2020, but said it is possible it could be delayed until 2021. That all depends on funding, availability and community support, he said.

Methner estimated the project could cost about $300,000 to $400,000, depending on design and how much help from the community there is. He said the foundation, in anticipation of renovating the parking, has been saving money throughout the years.

Currently the foundation has $120,000 in its endowment, he said.

“There’s potential grant money and we’ll be doing a lot of fundraising locally,” Methner said. “Often there are service clubs and individuals that want to help out with this kind of thing.”

Delikat said that the Dream Playground Foundation, which has been dedicated to keeping the playground maintained and preparing for the future, is in need of more board members.

“A lot of the people involved are still from the original build and we’re looking to expand,” he said. “For anyone interested in becoming a board member, we’re definitely looking for board members.”

The Dream Playground was built over five days in September 2002 by more than 2,000 local volunteers.

It is one of the largest volunteer projects Clallam County has ever seen, organizers said.

Starting in February 2002, the playground committee raised more than $185,000, nearly all from local businesses and individuals, to pay for the construction. Many local materials were donated as well.

For more information and to participate in the survey, visit padreamplayground.org.

________

Reporter Jesse Major can be reached at 360-452-2345, ext. 56250, or at jmajor@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading