A foundation crew works at the site of the Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

A foundation crew works at the site of the Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

Director: Work coming along swimmingly on Port Angeles pool

PORT ANGELES — Shore Aquatic Center is expected to begin to take shape next month.

The Port Angeles facility formerly known as William Shore Memorial Pool has been gutted for a $20 million renovation and 10,000-square foot expansion.

The pool, which closed to the public in May, is scheduled to reopen with new amenities in June.

“We’re going to see a lot of progress within this next month,” Executive Director Steve Burke said during a Friday tour of the construction site.

Crews work on foundations for the new Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

Crews work on foundations for the new Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

“We’re getting there. We’re on time and on schedule.”

Crews last week completed underground utility work for the new aquatic center.

Next week, Neeley Construction will begin to raise steel for the metal roof and walls of the exposed south side of the building at 225 E. Fifth St.

“That will look dramatic,” Burke said.

“It’s starting to look like we have a plan. When you’re doing the demo, it sometimes doesn’t look that way.”

Plans for the new aquatic center include a warm-water wellness pool for therapy classes and a children’s pool with a beach entry. The kids’ pool will have swirling splash features like a “lazy river” and “vortex ring.”

“We’ll do swim lessons in there,” Burke said.

William Shore Memorial Pool District executive director Steve Burke explains how stormwater at the site of the Shore Aquatic Center will be collected as he conducts a tour of the site in Port Angeles. (Keith Thorpe/Peninsula Daily News)

William Shore Memorial Pool District executive director Steve Burke explains how stormwater at the site of the Shore Aquatic Center will be collected as he conducts a tour of the site in Port Angeles. (Keith Thorpe/Peninsula Daily News)

”Parents will play with their kids in there. The lazy river is part of that.”

The main pool, children’s pool and warm-water therapy pool will be coated with plaster. Deeper handrails and steps will be installed to make it easier to climb out of the pool.

The aquatic center will have a portable lift for disabled users.

Larger locker rooms and offices will be built on the west side of the pool near the glassed main entrance.

After school programs will be housed in a dedicated space on the east side of the building.

Much of the south side of the structure will be covered in glass, providing unobstructed views to Klahhane Ridge.

Crews have installed a self-contained stormwater filtration system in the back parking lot east of the building.

Lakeside Industries of Port Angeles is scheduled to pave the main parking lot before the paving season ends Nov. 12.

Unlike the old pool that opened in 1961, the new aquatic center will be fully insulated.

The original swimming pool awaits eventual renovation as work continues to expand and improve the former William Shore Memorial Pool, now renamed the Shore Aquatic Center. (Keith Thorpe/Peninsula Daily News)

The original swimming pool awaits eventual renovation as work continues to expand and improve the former William Shore Memorial Pool, now renamed the Shore Aquatic Center. (Keith Thorpe/Peninsula Daily News)

“I learned to swim at the old pool, so this is exciting,” said Cherie Kidd, former mayor, Port Angeles City Council member and Shore Memorial Pool board member.

In 2009, the William Shore Memorial Pool District took ownership of the pool from the city after voters approved a new junior taxing district to run the pool, which city officials were considering closing because of its age.

Burke said the pool was renamed Shore Aquatic Center “to make it shorter.”

William “Bill” Shore was a long-time Port Angeles educator and coach who taught thousands of local children how to swim.

“We were trying to come up with a name that honored him, but also kind of just made sense as a name,” Burke said.

“And so with our being on the water, the shore and all that, it kind of satisfied both requirements.”

The new facility will have a display honoring Bill Shore.

A construction crew works on a section of the existing pool building at the future Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

A construction crew works on a section of the existing pool building at the future Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

“We worked with the Shore family,” Burke said.

“What we didn’t want to do is feel like we were trying to forget the past and not honor him as a legacy.”

Staffers who worked at the pool when it was opened in 1961 will be invited to the re-opening, Burke said.

“We’re all pushing for June,” Kidd said.

“I’m getting a new bathing suit just for the occasion.”

________

Reporter Rob Ollikainen can be reached at 360-452-2345, ext. 56450, or at rollikainen@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading