A foundation crew works at the site of the Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

A foundation crew works at the site of the Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

Director: Work coming along swimmingly on Port Angeles pool

PORT ANGELES — Shore Aquatic Center is expected to begin to take shape next month.

The Port Angeles facility formerly known as William Shore Memorial Pool has been gutted for a $20 million renovation and 10,000-square foot expansion.

The pool, which closed to the public in May, is scheduled to reopen with new amenities in June.

“We’re going to see a lot of progress within this next month,” Executive Director Steve Burke said during a Friday tour of the construction site.

Crews work on foundations for the new Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

Crews work on foundations for the new Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

“We’re getting there. We’re on time and on schedule.”

Crews last week completed underground utility work for the new aquatic center.

Next week, Neeley Construction will begin to raise steel for the metal roof and walls of the exposed south side of the building at 225 E. Fifth St.

“That will look dramatic,” Burke said.

“It’s starting to look like we have a plan. When you’re doing the demo, it sometimes doesn’t look that way.”

Plans for the new aquatic center include a warm-water wellness pool for therapy classes and a children’s pool with a beach entry. The kids’ pool will have swirling splash features like a “lazy river” and “vortex ring.”

“We’ll do swim lessons in there,” Burke said.

William Shore Memorial Pool District executive director Steve Burke explains how stormwater at the site of the Shore Aquatic Center will be collected as he conducts a tour of the site in Port Angeles. (Keith Thorpe/Peninsula Daily News)

William Shore Memorial Pool District executive director Steve Burke explains how stormwater at the site of the Shore Aquatic Center will be collected as he conducts a tour of the site in Port Angeles. (Keith Thorpe/Peninsula Daily News)

”Parents will play with their kids in there. The lazy river is part of that.”

The main pool, children’s pool and warm-water therapy pool will be coated with plaster. Deeper handrails and steps will be installed to make it easier to climb out of the pool.

The aquatic center will have a portable lift for disabled users.

Larger locker rooms and offices will be built on the west side of the pool near the glassed main entrance.

After school programs will be housed in a dedicated space on the east side of the building.

Much of the south side of the structure will be covered in glass, providing unobstructed views to Klahhane Ridge.

Crews have installed a self-contained stormwater filtration system in the back parking lot east of the building.

Lakeside Industries of Port Angeles is scheduled to pave the main parking lot before the paving season ends Nov. 12.

Unlike the old pool that opened in 1961, the new aquatic center will be fully insulated.

The original swimming pool awaits eventual renovation as work continues to expand and improve the former William Shore Memorial Pool, now renamed the Shore Aquatic Center. (Keith Thorpe/Peninsula Daily News)

The original swimming pool awaits eventual renovation as work continues to expand and improve the former William Shore Memorial Pool, now renamed the Shore Aquatic Center. (Keith Thorpe/Peninsula Daily News)

“I learned to swim at the old pool, so this is exciting,” said Cherie Kidd, former mayor, Port Angeles City Council member and Shore Memorial Pool board member.

In 2009, the William Shore Memorial Pool District took ownership of the pool from the city after voters approved a new junior taxing district to run the pool, which city officials were considering closing because of its age.

Burke said the pool was renamed Shore Aquatic Center “to make it shorter.”

William “Bill” Shore was a long-time Port Angeles educator and coach who taught thousands of local children how to swim.

“We were trying to come up with a name that honored him, but also kind of just made sense as a name,” Burke said.

“And so with our being on the water, the shore and all that, it kind of satisfied both requirements.”

The new facility will have a display honoring Bill Shore.

A construction crew works on a section of the existing pool building at the future Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

A construction crew works on a section of the existing pool building at the future Shore Aquatic Center in Port Angeles. (Keith Thorpe/Peninsula Daily News)

“We worked with the Shore family,” Burke said.

“What we didn’t want to do is feel like we were trying to forget the past and not honor him as a legacy.”

Staffers who worked at the pool when it was opened in 1961 will be invited to the re-opening, Burke said.

“We’re all pushing for June,” Kidd said.

“I’m getting a new bathing suit just for the occasion.”

________

Reporter Rob Ollikainen can be reached at 360-452-2345, ext. 56450, or at rollikainen@peninsuladailynews.com.

More in News

Port Townsend Main Street Program volunteers, from left, Amy Jordan, Gillian Amas and Sue Authur, and Main Street employees, Sasha Landes, on the ladder, and marketing director Eryn Smith, spend a rainy morning decorating the community Christmas tree at the Haller Fountain on Wednesday. The tree will be lit at 4 p.m. Saturday following Santa’s arrival by the Kiwanis choo choo train. (Steve Mullensky/for Peninsula Daily News)
Decoration preparation

Port Townsend Main Street Program volunteers, from left, Amy Jordan, Gillian Amas… Continue reading

Port Angeles approves balanced $200M budget

City investing in savings for capital projects

Olympic Medical Center Board President Ann Henninger, left, recognizes commissioner Jean Hordyk on Wednesday as she steps down after 30 years on the board. Hordyk, who was first elected in 1995, was honored during the meeting. (Paula Hunt/Peninsula Daily News)
OMC Commissioners to start recording meetings

Video, audio to be available online

Jefferson PUD plans to keep Sims Way project overhead

Cost significantly reduced in joint effort with port, city

Committee members sought for ‘For’ and ‘Against’ statements

The Clallam County commissioners are seeking county residents to… Continue reading

Christopher Thomsen, portraying Santa Claus, holds a corgi mix named Lizzie on Saturday at the Airport Garden Center in Port Angeles. All proceeds from the event were donated to the Peninsula Friends of Animals. (Dave Logan/for Peninsula Daily News)
Santa Paws

Christopher Thomsen, portraying Santa Claus, holds a corgi mix named Lizzie on… Continue reading

Peninsula lawmakers await budget

Gov. Ferguson to release supplemental plan this month

Clallam County looks to pass deficit budget

Agency sees about 7 percent rise over 2025 in expenditures

Officer testifies bullet lodged in car’s pillar

Witness says she heard gunfire at Port Angeles park

A copper rockfish caught as part of a state Department of Fish and Wildlife study in 2017. The distended eyes resulted from a pressure change as the fish was pulled up from a depth of 250 feet. (David B. Williams)
Author to highlight history of Puget Sound

Talk at PT Library to cover naming, battles, tribes

Vern Frykholm, who has made more than 500 appearances as George Washington since 2012, visits with Dave Spencer. Frykholm and 10 members of the New Dungeness Chapter, NSDAR, visited with about 30 veterans on Nov. 8, just ahead of Veterans Day. (New Dungeness Chapter DAR)
New Dungeness DAR visits veterans at senior facilities

Members of the New Dungeness Chapter, National Society Daughters of… Continue reading

Festival of Trees contest.
Contest: Vote for your favorite tree online

Olympic Medical Center Foundation’s Festival of Trees event goes through Dec. 25