Department of Ecology announces penalties for paper mills in Port Angeles, Port Townsend

Both the Port Townsend Paper Corp. mill and Nippon Paper Industries USA Co. in Port Angeles were assessed $4,000 in penalties for violating their permits during the past six months.

The state Department of Ecology announced the fines — levied in April against the Port Townsend mill and in February against the Nippon mill — last week when it issued a summary of penalties issued throughout the state during the first six months of the year.

The penalties were assessed for permit violations that occurred in fall 2010.

Both paper mills have paid the fines.

First in eight years

Nippon’s penalty was “our first fine in eight years,” said Paul Perlwitz, the environmental manger for the mill on Marine Drive, on Friday.

Nippon was fined $4,000 on Feb. 14 for “samples that exceeded biochemical oxygen demand, which can deplete oxygen levels in the receiving waters,” Ecology said.

That means the mill discharged waste water with oxygen-consuming bacteria above permitted levels into the Strait of Juan de Fuca, Perlwitz said.

Biochemical oxygen demand — or BOD — is a measure of how much oxygen is consumed by microorganisms in response to substances in the wastewater.

Too much biochemical oxygen demand depletes oxygen in the water, and this can harm fish and other aquatic life.

Nippon’s discharge line goes outside Port Angeles Harbor into the Strait, Perlwitz said.

An equipment malfunction in October led to the plant “discharging more material to the wastewater treatment plant than we normally do,” Perlwitz said.

Nippon reported the event immediately, as well as in its monthly report to Ecology, he said.

He said usually the mill operates at 20 percent to 25 percent of its permit limit, “so typically, we are 75 percent below our permit limit.”

Port Townsend

The Port Townsend mill was fined April 18 for nitrogen oxides emissions from power boiler 10 that exceeded the mill’s permitted maximum on four occasions in 2010.

The occasions were Oct. 18, two separate time periods Dec. 2 and on Dec. 6, said Kim Schmanke, Ecology spokeswoman.

“There were four exceedances in late 2010 that violated the company’s air operating permit,” she said.

The mill issues monthly reports to Ecology, which evaluates the emissions against the maximum the mill is allowed to emit.

Chuck Madison, vice president of human resources at the Port Townsend mill, said he had no comment in compliance with the company’s policy of making no statements to the media.

Ecology issued $519,957 in penalties of $1,000 or more in the first six months of 2011.

To see the penalties issued in the first quarter of the year, visit http://tinyurl.com/3uo2x9p.

To see those issued in the second quarter, visit http://tinyurl.com/3zygq3q.

Ecology issues individual statements only for penalties of $10,000 or greater.

Ecology uses money from penalties for environmental restoration and enhancement projects, research and development, permitting and regulatory programs, and education and assistance, the agency said.

________

Managing Editor/News Leah Leach can be reached at 360-417-3531 or leah.leach@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading