Debris from ship that spilled containers packed off beaches

VANCOUVER ISLAND — Some 71 refrigerators, 81 bags of Styrofoam, 19 bags of garbage and 11 helicopter bags of garbage from containers that fell off of the M/V Zim Kingston have been flown off of Cape Palmerston beach and into metal bins in a nearby parking lot, according to the Canadian Coast Guard.

That meant that all the large debris that had shown up on the Palmerston-area beaches had been removed by Sunday, officials said.

At least 109 containers — rather than the original 40 reported — fell from the MV Zim Kingston on Oct. 22 as the ship, which was carrying nearly 2,000 containers from South Korea, was bucked by heavy seas just west of the entrance to Strait of Juan de Fuca.

About 10 of those that remained aboard burned the next day after the Kingston had anchored at Constance Bank, almost 5 miles from Victoria’s shore and about 17 miles from the U.S.

On Oct. 29 and over the weekend, contractors hired by the owner of the M/V Zim Kingston began to organize and remove debris from the containers on the beach at Cape Palmerston.

Crews would soon begin removing debris from Guise Bay at Cape Scott, as weather permitted, the Canadian Coast Guard said on Monday.

To date, only four shipping containers have been found on the beach, officials said.

One of these containers is breached and one is damaged.

Plans are underway for the removal of all four containers via helicopter when a weather window permits.

Searchers are looking for additional floating or beached containers.

A water sampling operation, to detect any contaminants in the water column as a result of the fires, has occurred and results are expected this week.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading