DAVID G. SELLARS ON THE WATERFRONT: Two big tankers repaired in Port Angeles

OVERSEAS MARTINEZ, A 600-foot petroleum products carrier, is moored to the Port of Port Angeles’ T-Pier.

Straits Marine and Industrial on Marine Drive has personnel aboard making piping modifications and performing routine maintenance in the engine room.

The diesel-powered tanker has a 105-foot beam and can move nearly 14 million gallons of refined product through the water at about 14 knots.

The ship, which was launched last April, was the ninth of 12 Veteran Class MT-46 tankers being built by Aker Philadelphia Shipyard and 13th overall to be built by Aker on the grounds of the former site of the Philadelphia Naval Shipyard.

The final three ships in the series will be completed by July of this year. Sadly, that could sound the death knell for the shipyard.

With the slowdown in the economy, the shipyard has no backlog of orders — which will ultimately force it to shut down.

The survival of the enterprise currently depends upon a plan that is afoot for the state of Pennsylvania to help provide funding that, coupled with private financing, would enable Aker to build two tankers on speculation that would be sold at a later date to a qualified buyer.

Such a plan would keep the shipyard’s work force employed and give the company additional time to weather the economic storm that has roiled the nation for the last couple of years.

Next door, at the port’s Terminal 1 North, another tanker, Sierra, moored last Tuesday.

Washington Marine Repair, the topside repair facility on the waterfront, has personnel onboard fabricating saltwater strainers.

According to Chandra “Hollywood” McGoff, personnel also are making deck repairs and repairing the anchor windlass on the 831-foot tanker.

Island Tug and Barge of Seattle has a barge moored stern to Terminal 1 just forward of the ship’s bow, where personnel stowed four shots of the starboard side anchor chain and a new anchor while repairs were being made to the windlass.

The SeaRiver Maritime-owned vessel formerly named Kenai lost her starboard anchor and about 1,200 feet of anchor chain after leaving Valdez, Alaska.

Navy camels

Platypus Marine in Port Angeles last week was awarded a government contract to assemble four barge camels that will be used by the Navy in Bremerton.

A camel is maritime lingo for a float.

In this case, the floats will be 60 feet long by 17 feet wide and have an undercarriage resembling a maze of pipes that extends 20 feet into the water to help stabilize the platform.

The camels will be built by Maritime Industries in Broussard, La., and shipped by truck to Platypus Marine.

The deck of each float will be shipped in one piece and the undercarriages, which consist of three pieces, will require a like number of trucks for shipment.

When the pieces arrive at Platypus Marine’s facility, they will be offloaded by Jay Ketchum of Affordable Crane, which will also work with the manufacturer’s assembly team to put the four pieces of each 57-ton float together.

According to Charlie Crane, director of sales and marketing for Platypus Marine, assembling the four barge camels should take about 10 days.

Charlie said once they are all assembled, Joe Manke of Manke Tug and Barge of Tacoma will tow them en bloc to Puget Sound Naval Shipyard.

There in Bremerton, they will be used for various tasks, including platforms from which to perform maintenance and (no doubt) by aspiring boatswain’s mates to learn the finer points of painting the side of a ship.

Waterfront notes

— Alaskan Legend, a 941-foot crude oil tanker, was anchored in Port Angeles for most of Thursday.

The tug, Scout, brought a load of fuel to her from the ConocoPhillips refinery in Ferndale.

By late afternoon, the refueling process was complete, and by 6 p.m. the tanker was underway for Valdez, Alaska, for another 50 million-plus gallons of crude oil.

— Dunlap Towing, the company that handles the waterborne log storage at the east end of Port Angeles Harbor, had two divers in the water last week at its boom grounds.

I understand they were inspecting the chains and anchoring system that is attached to the buoys that Dunlap uses to tether their log booms.

— The North Olympic Sail and Power Squadron will hold its monthly meeting on Monday at the Cedars at Dungeness Golf Club, 1965 Woodcock Road northwest of Sequim.

There will be a social hour at 5 p.m., and dinner will be served at 6 p.m. Anyone interested in boating is invited to attend.

Dinner is $19 and reservations may be made by phoning Deta Stem at 360-684-9444.

— Beginning Tuesday and for the next 10 weeks, the North Olympic Sail and Power Squadron is conducting a seminar on piloting.

This detailed course explores coastal and inland navigation, chart reading and the use of GPS.

The two hour course will be held in the recreation room at the Rainbow RV Park in Sequim and begin promptly at 1:30 p.m.

The course fee is $48 for members and $95 for non-members.

For further information or to make reservations, phone Mark Lewis at 360-683 9479.

Fueling up

On Monday, Tesoro Petroleum provided bunkers to Overseas Long Beach and then the 600-foot petroleum products tanker got under way for her namesake port.

Tesoro on Wednesday refueled the 600-foot Overseas Nikiski and she is due in Valdez, Alaska, early Monday morning.

On Thursday, Tesoro bunkered IVS Kestrel, a 580-foot bulk cargo ship bound for Portland, Ore.

Then Friday, Tesoro bunkered Expander, a 620-foot, Panamanian-flagged bulk cargo ship.

________

David G. Sellars is a Port Angeles resident and former Navy boatswain’s mate who enjoys boats and strolling the waterfront.

Items involving boating, port activities and the North Olympic Peninsula waterfronts are always welcome.

E-mail dgsellars@hotmail.com or phone him at 360-808-3202.

His column, On the Waterfront, appears every Sunday.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading