DAVID G. SELLARS ON THE WATERFRONT: Oil spill boat getting outfitted in Port Angeles

NRC Quest has been moored to the Port of Port Angeles’ Terminal 1 South since the first week of September.

She is the former offshore supply vessel that operated in the Gulf of Mexico out of Port ­Fourchon, La., named Seacor Quest.

In May, National Response Corp. acquired the 160-foot vessel, and in late summer she was sent to Port Angeles for conversion to an oil spill response vessel, an OSRV in waterfront lingo.

Straits Marine and Industrial, the topside repair company whose offices are on the waterfront, were contracted to perform the work.

According to Roy McKay, Straits Marine president, some of the work his company is performing includes installing two pedestal-mounted hydraulic cranes and the components necessary to operate them.

An anchor windlass is being installed on the forepeak to operate newly installed port and starboard anchors. A four-point anchoring system is also being installed for use in future salvage and dive operations.

The company also is installing a sewage treatment system aboard the boat, Roy said, and personnel will be building a raised deck on the aft section of the boat that will take about 50,000 pounds of steel to complete.

When I asked Roy when the project would be completed, he said he wasn’t sure —but he and his personnel had already picked out a spot where this year’s Christmas tree will stand.

It’s the season

Stewart Pugh will be the featured speaker at Wooden Boat Wednesday in Port Townsend this week to talk about something timely — winterizing your outboard motor.

He’ll speak at noon at the Chandlery in the Northwest Maritime Center at 431 Water St.

Stewart has spent nearly 50 years perfecting his craft by working on all types of marine engines.

“Outboard motors in a saltwater marine environment demand more attention than most operators provide,” he said. “Loss of an outboard on a small skiff or sailboat could result in an expensive rescue or loss of life.

“Simple and routine maintenance tasks increase safety on the water and increase the life of the outboard motor.”

During the 90-minute presentation, special attention will be given to salt water, fuel, corrosion, electrical and unintentional abuse to two- and four-cycle engines.

Stuart said his goal for this class is to help boat owners reduce repair costs and learn for themselves how to inspect and detect basic outboard motor problems.

Simple and routine maintenance will be demonstrated and Stewart will have parts of various outboards on display for “show and tell.”

Stuart has also written a manual, Basic Outboard Maintenance, which is the culmination of his years of experience repairing and restoring outboard motors.

The manual was published locally by Protection Island Publishing in Port Townsend and will be for sale for the first time at Wednesday’s event for $19.95.

Seating is limited and requires advance registration by contacting the maritime center at 360-385-3628, ext. 101, or by sending an email to chandlery@woodenboat.org.

Water quality

Alaskan Frontier, a 941-foot, double-hull crude oil tanker anchored in the harbor last week.

According to Chandra “Hollywood” McGoff of Washington Marine Repair, the topside repair facility at the foot of Cedar Street, personnel were onboard for a couple of days replacing valves, piping and grating in the reefer. Personnel also were working on the piping of the water quality package.

A water quality package is a self-contained system that filters out solid particles from salt water that are as small as 80 microns (0.003 of an inch) to create a supply of abrasive-free water.

This conditioned water is then used to cool and lubricate the stern tube bearings, which support the rotating propeller shafts.

Barge stowed

Platypus Marine Inc. hauled out the barge Ediz Hook and has it stowed in the Commander Building on Marine Drive in Port Angeles.

The steel barge, which is 110 feet long and 54 feet wide, was built for the U.S. Navy in 1943 by the Pacific Car and Foundry Co. of Seattle, which also constructed dry docks, steel tugboats and Sherman tanks for the World War II effort.

The barge, formerly named Olive Oil, is currently used by the Puget Sound Pilots as a mooring barge for their two pilot boats, Strait of Juan de Fuca and Puget Sound.

Personnel at Platypus will spend the next couple of weeks sandblasting corroded areas, painting the barge and attaching a new set of zincs.

On the hard

Last month, Jeremy Winn of Hoquiam had his commercial boat, Melissa Lynn, on the hard at Platypus for a number of upgrades.

Jeremy has since sold the boat and purchased a 58-foot Jensen that was used in Monterey, Calif., to fish for squid.

The boat, which is sitting on the hard, is now named Quallay Squallum and will be used by Jeremy as a seiner and a crabber.

According to Capt. Charlie Crane, director of sales and marketing for Platypus Marine, personnel will paint the main deck and install MAXiTUF non-skid decking.

Personnel also will install lights on the mast that will be used for crabbing. A new davit for handling crab pots will be installed, and a fuel cleaning system in the engine room will be set up.

Platypus also has Aleutian Belle on the hard. She is a 58-foot Delta that took eight days to journey from her hailing port of Kodiak, Alaska, to Port Angeles.

Capt. Charlie said she will be at Platypus’ facility for about three weeks for installation of a bulbous bow with a bow thruster and to have her rolling chocks enlarged.

Fueling up

Tesoro Petroleum on Tuesday bunkered Polar Discovery, an 895-foot crude oil container that is due in Valdez, Alaska, tonight for another big gulp.

On Wednesday, Tesoro refueled the Crowley owned articulated tug and barge Vision/650-10.

________

David G. Sellars is a Port Angeles resident and former Navy boatswain’s mate who enjoys boats, ships and strolling the waterfront.

Items involving boating, port activities and the North Olympic Peninsula waterfronts are always welcome. Email ­dgsellars@hotmail.com or phone him at 360-808-3202.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading