The 73-foot La Rata Bastarda

The 73-foot La Rata Bastarda

DAVID G. SELLARS ON THE WATERFRONT: Boat that burned in 2013 leaves Port Angeles for Canadian port

THE 73-foot ex-commercial fishing vessel converted into a yacht with a colorful name has left after quite an adventure in Port Angeles.

Platypus Marine, the full-service shipyard, yacht-repair facility and steel-boat manufacturer on Marine Drive, put La Rata Bastarda in the water last week.

On April 1, 2013, while on the hard at Platypus Marine’s yard, she caught fire while personnel were making welding repairs to the hull of the steel vessel for its Eatonville owners.

The afternoon blaze caught a lot of attention at the time as it forced the evacuation of 60 employees from Platypus’ facilities and thick smoke wafted across Marine Drive.

Flashing forward, I’m told the insurance company has sold the boat to a Canadian owner who arrived last week to tow the vessel — still showing some fire scars — from Port Angeles to her new undisclosed hailing port.

So long, La Rata Bastarda.

Navy patrol boat

Platypus Marine last Monday hauled out a 64-foot aluminum Navy patrol boat that is stationed in Bangor.

The boat is an escort vessel that was built by Gladding-Hearn Shipbuilding in Somerset, Mass.

Her mission is to act as a screen for high-value military assets in domestic ports.

The vessel works in concert with the HOS Arrowhead and HOS Eagleview to escort submarines as they transit the Strait of Juan de Fuca into and out of Hood Canal.

The patrol boat is powered by twin MTU diesel engines that are coupled to Hamilton water jets and can reach speeds in excess of 30 knots.

The boat is equipped with a head, galley, berths and lockers, and mounted on the foredeck is a remotely operated weapons system.

The interior is outfitted with Shockwave heavy-duty suspension seats, shock-mitigating floor matting and a heating and air-conditioning system.

She is equipped with a thermal imaging system and an array of the latest technology for navigational and communication requirements.

I understand personnel are replacing the non-skid surfaces on the patrol boat.

Three-day work

Also last Monday, Platypus Marine hauled out Huey’s Island, a 110-foot Broward Luxury yacht.

Personnel replaced the yacht’s shaft seals and gave her bottom a fresh coat of paint.

She was back in the water Thursday afternoon, and I understand that Huey’s Island will spend the balance of the summer season in Alaskan waters.

Out of season

On Wednesday morning as the Washington State Ferry my wife and I were riding to Seattle was pulling into Elliott Bay, we saw the Bahamian-flagged bulk cargo ship Atlantic Hawk being loaded at the grain facility at Terminal 86.

From what little I know, the sight seemed a bit out of place because my understanding is that during the summer months, the products needed to fill the silos at the terminal are in the ground growing.

As a consequence, shipments from the terminal typically occur during the winter months.

Notwithstanding my bewilderment at what was going on, it was still an interesting sight to behold.

Port Angeles Harbor watch

Tesoro Petroleum last Monday provided bunkers to Finesse, a 900-foot petroleum products tanker anchored in Port Angeles Harbor.

Then on Wednesday, the barge Tesoro uses to bunker ships in the harbor was taken to Seattle, where it spent the rest of the week refueling cruise ships.

The refueling barge will return to Port Angeles on Monday.

________

David G. Sellars is a Port Angeles resident and former Navy boatswain’s mate who enjoys boats and strolling the area’s waterfronts.

Items and questions involving boating, port activities and the North Olympic Peninsula waterfronts are always welcome. Email dgsellars@hotmail.com or phone him at 360-808-3202.

His column, On the Waterfront, appears Sundays.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading